My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 11:53:50 AM
Creation date
1/23/2019 11:53:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
12/4/2018
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
9
Tracking Number
0000801
Total Compensation
$13,855,462.69
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Project: Grand Avenue Park Bridge <br /> Change Order No.: 9 <br /> Change Order Effective Date: 11-13-2018 <br /> 1. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts,Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 2. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 3. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition,protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 4. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> 7_.7 <br /> L._,a <br /> AO <br /> t • , Ilisiii,62cL__ <br /> Yo City Clerk I 4 .' Atto .7E2. <br /> Date: / Date: /0y4-7 /8 Date. <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Depailment Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> i'ivgl-ert-J1' -EW /I htifte/ iI i .. I 1 iJa441#1410t-v" <br /> Date: //-/(a- /$ sate: — i-20/B D. '-: i Date: it f Zcl/((, <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.