Laserfiche WebLink
Project: Grand Avenue Park Bridge <br /> Change Order No.: 9 <br /> Change Order Effective Date: 11-13-2018 <br /> CONTRACTOR <br /> I /)3//By Date: $ <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> TMF Specific Changes due to RFIs—This change order captures the cost for specific added work for <br /> Thompson Metal Fab based on the responses to specific RFIs and attached change order proposals <br /> including: <br /> COP 003: Add'! Steel for Stair Landings (RFI-094 and 097) <br /> COP 006: Add'l Drip Holes to be Drilled in the Bottom Chord (RFP-004) <br /> COP 007: Revised Utility Level Deck Grating Material (RFI 222) <br /> COP 008: Add'l Utility Room Roof Steel (RFI 171) <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> New Bid Items— See attached for New Bid Items to Sch. A and B. <br /> Measurement and Payment <br /> Measurement and Payment for the new bid items shall be Lump Sum. <br /> ATTACHMENTS(21 Additional Pages) <br /> • New Bid Items <br /> • ICI COPS-003, 006, 007 and 008 <br /> Page 3 of 3 <br />