Laserfiche WebLink
l J INTERWEST <br /> CONSTRUCTION <br /> 01 <br /> INC. <br /> 3/08/18 COP-003 <br /> Ken Kettel, Engineer <br /> City of Everett <br /> 3101 Cedar Street <br /> Everett, WA 98201 <br /> RE: Grand Ave Bridge <br /> PW 3588 <br /> COP 003 —Additional Costs based on RFI responses <br /> Mr. Kettel: <br /> Interwest Construction, Inc. (Interwest)is providing the change order proposal based on responses provided to RFI 094 <br /> and RFI 097. This proposal totals$2,915.34. <br /> Thompson Metal Fab is performing these items in their shop. A breakdown of the charges is attached for reference. <br /> Please feel free to contact me with any questions or concerns you may have regarding this request. <br /> Respectfully submitted, <br /> 94-i 17111Ar\ <br /> INTERWEST CONSTRUCTION, INC. <br /> Geoff Bryson <br /> Project Manager <br /> 609 North Hill Blvd. . Burlington, WA 98233 <br /> www.interwest.biz <br /> Estimating Dept. Fax (360) 757-6464 <br /> Phone (360) 757-7574 Fax (360) 757-4196 <br /> Contractor License INTERC1121OF <br />