My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 11:53:50 AM
Creation date
1/23/2019 11:53:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
12/4/2018
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
9
Tracking Number
0000801
Total Compensation
$13,855,462.69
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST CONSTRUCTION INC <br /> 651 N Hill Blvd <br /> Burlington,WA 98233 <br /> DATE: 03/08/18 Telephone(360)757-7574 <br /> JOB No.: 1157-Grand Ave Park Bridge <br /> Ticket No.: PW 3588 <br /> EXTRA WORK/TIME& MATERIALS SUMMARY SHEET <br /> CUSTOMER: <br /> DESCRIPTION OF WORK: <br /> Interwest incurred costs associated with responses to RFI 094 for the additional HSS tubing and RFI 097 for the <br /> additional plates <br /> Name LABOR SUMMARY-REGULAR Hours Total <br /> Geoff Bryson Project Manager 0.00 $0.00 <br /> Julie Chonzena Project Engineer 0.00 $0.00 <br /> Bruce Vetch(1/2 time) General Super 0.00 $0.00 <br /> $0.00 <br /> Sub-Total $0.00 <br /> 29% O.H.&Profit $0.00 <br /> Total Regular Cost $0.00 <br /> Name MATERIALS SUMMARY Unit Cost Total <br /> TMF CCO 2 RFI 094 Additional 4 x 4 1/2"tubing for stair landings 1.00 $2,136.13 <br /> TMF CCO 3 RFI 097 Additional 30 Plates 3/8"x 4 x 4 galvanized 1.00 $273.24 <br /> Sub-Total $2,409.37 <br /> 21% O.H.&Profit $505.97 <br /> Total Mob.Cost $2,915.34 <br /> Hours Equip.# OPERATING EQUIPMENT SUMMARY Unit Cost Total <br /> 0.0 08-114 2002 Dodge 3500 Diesel Flatbed Truck $61.86 $0.00 <br /> 0.0 26-03 2016 Linkbelt 2l8HSL 110 Ton Crawler Crane $189.67 $0.00 <br /> $0.00 $0.00 <br /> Sub-Total $0.00 <br /> 21% O.H.&Profit $0.00 <br /> Total Equip.Cost $0.00 <br /> TOTAL TIME AND MATERIALS $2,915.34 <br /> Labor Scale: <br /> Bruin Overtime <br /> Project Manager $75.00 PM 8112.50 Approved By: <br /> Project Engineer $55.00 PE $82.50 <br /> General Super $110.00 GS $165.00 <br /> CHANGE ORDER REQUESTED: EYES EI NO <br /> AUTHORIZED BY: DATE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.