My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc 1/16/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
Murraysmith Inc 1/16/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 11:30:55 AM
Creation date
1/24/2019 9:47:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc
Approval Date
1/16/2019
Council Approval Date
1/9/2019
End Date
12/31/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Svcs for Replacement of Reservoir 2
Public Works WO Number
UP3658 2
Tracking Number
0001624
Total Compensation
$846,608.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Murraysmith Inc. 5/4/2021 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stray current interference, and locate nearby corrosion control equipment operated <br /> by the City. <br /> b. Review design documents provided by Murraysmith. <br /> c. Provide drawings and specifications of cathodic protection system for each submittal <br /> package. <br /> d. Update drawings and specifications based upon client review comments. <br /> e. Assist during bidding with review and responses to questions from bidders, as needed. <br /> 227.5 Surveying <br /> Duane Hartman &Associates(DHA)will provide surveying services for the project. A more detailed <br /> description of the services to be provided follows. <br /> a. Locate underground utilities within the right of way using professional locate service, <br /> engage On-call Locate for the City to paint its franchised utilities. <br /> b. Perform field survey and topographic mapping of approximately 600 lineal feet of right <br /> of way along Edwards Avenue from Federal Avenue to Friday Avenue. <br /> Task 228 — Unanticipated Labor or Expenses <br /> This task will include additional unanticipated labor or expenses not specifically identified in the <br /> scope of work tasks defined above. Such work items will be implemented on a work order basis <br /> and will be undertaken only after written authorization from the City's Project Manager. <br /> ESTIMATED SCHEDULE <br /> Murraysmith is prepared to begin work on this project immediately upon receipt of notice to <br /> proceed from the City. Services contained herein will be completed while working in close <br /> coordination with City staff within the project schedule provided as Exhibit Cl. <br /> ENGINEERING FEE ESTIMATE <br /> An engineering fee estimate, Exhibit B1, has been prepared with a supplemental services <br /> management reserve for Phase 2 based on the detailed scope of services contained herein. The <br /> City will provide written authorization prior to proceeding with any Supplemental Services. <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> November 29, 2018 Final Design Page 12 <br /> \\Pdx-file\bd\Clients\Everett,WA\Reservoir 2 9-16(16-1910)\Scope-Fee-Contract\Final Design\Nov 2018\Exh Al-Everett Reservoir 2 Rplcmnt Ph2 Scope 2018-11-29.doc), <br />
The URL can be used to link to this page
Your browser does not support the video tag.