My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc 1/16/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
Murraysmith Inc 1/16/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 11:30:55 AM
Creation date
1/24/2019 9:47:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc
Approval Date
1/16/2019
Council Approval Date
1/9/2019
End Date
12/31/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Svcs for Replacement of Reservoir 2
Public Works WO Number
UP3658 2
Tracking Number
0001624
Total Compensation
$846,608.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Murraysmith Inc. 5/4/2021 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. Update geotechnical report with additional information and recommendations as <br /> necessary. <br /> h. Meet onsite with City during test pit excavations performed by City to observe soil <br /> conditions and collect samples lab testing. <br /> i. Install monitoring wells in two to three borings to evaluate long term groundwater <br /> levels. <br /> 227.2 Structural Engineering <br /> Peterson Structural Engineers will provide structural engineering services for the project, including <br /> providing design drawings, specifications and calculations for building permit submittal and <br /> participating in teleconferences and meetings with the project team as necessary.A more detailed <br /> description of the services to be provided follows: <br /> a. Perform structural analysis and design of two 2.5 MG AWWA D110 Type I reservoirs <br /> with exterior stairway, CMU storage building, and Reservoir 4 wall modifications <br /> including retaining wall. <br /> b. Prepare construction drawings and assist with structural sections of technical <br /> specifications for each submittal package. <br /> c. Review and respond to various design review comments and questions. <br /> d. Submit signed and stamped bidding/construction drawings and structural <br /> calculations. <br /> e. Assist during bidding with review and responses to questions from bidders, as <br /> needed. <br /> 227.3 Electrical Engineering <br /> R&W Engineering will provide electrical, instrumentation and control engineering services for the <br /> project, including providing design drawings, specifications and calculations for building permit <br /> submittal and participating in teleconferences and meetings with the project team as necessary. <br /> A more detailed description of the services to be provided follows. <br /> a. Coordinate electrical service with the local power utility. <br /> b. Prepare construction drawings and technical specifications for each submittal package. <br /> c. Review and respond to various design review comments and questions. <br /> d. Submit signed and stamped bidding/construction drawings and 'calculations. <br /> e. Assist during bidding with review and responses to questions from bidders, as needed. <br /> 227.4 Corrosion Engineering <br /> Northwest Corrosion will provide corrosion control engineering support for the project. A more <br /> detailed description of the services to be provided follows. <br /> a. On-site investigation of piping installation location. This will include a corrosivity <br /> analysis of the soil for groundbed design purposes, investigating potential sources of <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> November 29, 2018 Final Design Page 11 <br /> \\Pdx-file\bd\Clients\Everett,WA\Reservoir 2 9-16(16-1910)\Scope-Fee-Contract\Final Design\Nov 2018\Exh Al-Everett Reservoir 2 Rplcmnt Ph2 Scope 2018-11-29.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.