My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc 1/16/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
Murraysmith Inc 1/16/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 11:30:55 AM
Creation date
1/24/2019 9:47:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc
Approval Date
1/16/2019
Council Approval Date
1/9/2019
End Date
12/31/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Svcs for Replacement of Reservoir 2
Public Works WO Number
UP3658 2
Tracking Number
0001624
Total Compensation
$846,608.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Murraysmith Inc. 5/4/2021 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT Al <br /> SCOPE OF SERVICES <br /> City of Everett <br /> Replacement of Reservoir 2 <br /> Work Order #UP3658 <br /> PHASE 2 - FINAL DESIGN AND BIDDING <br /> Background <br /> Murraysmith, Inc. (Murraysmith) has developed the following scope of services and accompanying <br /> fee estimate to provide engineering services for final design and bidding of the Replacement of <br /> Reservoir 2 project. The scope and fee have been developed based on discussions with City of <br /> Everett (City) staff and our understanding of the project. <br /> Project Approach <br /> The engineering services to be provided by Murraysmith will be accomplished using a phased <br /> approach, as follows: <br /> • Phase 1 — Preliminary Design (completed) <br /> • Phase 2 — Final Design and Bidding (this scope of work) <br /> • Phase 3 —Construction Support Services (future scope of work) <br /> Based on this approach, the scope of services and fee estimate for the Phase 2 work program are <br /> detailed herein. The well-defined set of improvements from Phase 1 will be used as the basis for <br /> the final design work program under Phase 2. <br /> Project Understanding and Assumptions <br /> A brief overview of the major proposed improvements is presented below: <br /> • 5.0 MG of storage in two 2.5 MG AWWA D110 Type 1 prestressed concrete reservoirs <br /> • 1,400 square foot storage building <br /> • Two parallel 24-inch diameter water mains between Reservoir 2 and Reservoir 1 <br /> • New valving to connect Transmission Lines 2, 3 and 4 <br /> • Demolition of the existing 10 MG open concrete Reservoir 2 and Valve House 2. <br /> • The final design will be based on the 30% preliminary design plans prepared during Phase <br /> 1 of the project. <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> November 29,2018 Final Design Pagel <br />
The URL can be used to link to this page
Your browser does not support the video tag.