Laserfiche WebLink
Item #11. Add a new section looking north/south to show the deck <br /> framing all the way to the basement. <br /> Response: New Section E-E drawn and added to sheet S4-C to clarify <br /> framing at the deck over the roof. <br /> Item #12./Show how deck is drained. <br /> Response: See section E-E and the deck detail added to sheet S4-C. <br /> Selected a sloped deck to a gutter and down spout to <br /> existing lower roof. <br /> Item#13 / how how existing fireplace is to be supported at new <br /> foundation. <br /> Response: Added new detail 11 on sheet DT1.1 with full narrative on <br /> procedure to be used by the contractor to support the <br /> fireplace during construction. <br /> Item #14. /Specify window well requirements on the plan with a <br /> section detail through the well. <br /> Response: Added detail 10 on sheet DT1.1 specifying configuration of <br /> the window well construction. <br /> Item #15. jhe shear wall panels note does note coordinate accurately <br /> with detail 1 on sheet DT1.0. Also shows shear plywood on <br /> wrong side. <br /> Response: Changed the general note to clarify shear wall panels to be <br /> used. See L-1, L-2, and L-3. Also changed the callout for the <br /> side the plywood needs to be on the pony walls on sheet L-2. <br /> Item# 16. The framing plans and floor plans are different than the <br /> construction drawings submitted for permit. <br /> Response: I have redrawn the calc sheet layouts for the vertical loads <br /> to show correctly coordinated plans and calcs for file of the <br /> project. The resubmitted calcs are provided for final <br /> verification of the new framing and floor plans. <br /> (3 �' <br />