Laserfiche WebLink
Mr. John Day <br /> Slichter Ugrin Architecture <br /> Plan Check Number: B1709-015, First Review <br /> April 27, 2018 <br /> submitted for review, including but not limited to: end shear, end flexure, crushing at the end <br /> thru-bolt, bolt shear, and bearing on the support. Note that a single bolt provides the primary <br /> shear transfer at the ends, and the bolt placement is staggered along the length and vertically. <br /> The capacity and detailing check for the bolt capacities and detailing shall consider the most <br /> severe position of the bolt in the beam depth. See IBC Sections 1604.2 and 1604.4. Please see <br /> updated drawings. Details 2 & 3/S2.2 have been added to clarify bearing conditions and <br /> column connections. The channels are intended to bear directly on the supports. The thru bolts <br /> in detail 9/S2.1 are not intended to transmit load to the wood members. Calculations <br /> substantiating the design have been provided. <br /> Lateral System: <br /> 10. Page 2 of the structural calculations provides the design wind pressures for the parapet design. <br /> The wind pressures should be revised based on the following comments. The structural design <br /> may need to be revised. See IBC Section 1609.1. <br /> a. The exposure adjustment factor (EAF) appears to be based on a height of 15 feet per ASCE <br /> 7-10 Table 30.7-2. The factor should be EAF=0.692 for a maximum parapet height of <br /> approximately 20 feet per the elevations on Sheet A4.1. Updated EAF Value. <br /> b. The windward and leeward pressures appear based on a maximum height of 15 feet. <br /> Design pressures, including the roof pressure considered for the windward pressure, shall <br /> be based on the maximum parapet height of 20 feet. See ASCE 7-10 Section 30.7.1.2 and <br /> Figure 307-1. Pressures have been updated. <br /> c. The windward and leeward parapet pressures shall consider positive and negative <br /> pressures on each side of the respective parapets per Figure 30.7-1. Based on Table 30.7- <br /> 2, the windward and leeward pressures appear to be at least 105.9 psf and 72.6 psf, <br /> respectively. Correct, pressures have been updated, these values multiplied by EAF*RF*Kzt <br /> equate to 73.3psf and 50.2psf, respectively. <br /> d. The calculations for the design of the framing and connections should be revised using the <br /> required wind pressures. The windward and leeward pressures should should be applied in <br /> the applicable directions for all portions of the structure to develop the maximum load <br /> effects. Parapet frame analysis has been re-evaluated with the higher loads. See updated <br /> calculations. <br /> 11. The design of the parapet brace framing is shown in Section 1/S2.1 and Details 4/S2.1 and <br /> 5/S2.1. The following comments should be addressed: <br /> a. The minimum required weld lengths should be specified in Detail 5/S2.1. Note that the <br /> framing in Section 1/S2.1 appears to overlap. In addition, the fit-up of the framing is not <br /> flat and will result in skews between members and gaps between welded surfaces. The <br /> weld size should be oversized to account for gaps and transfer of loads through <br /> overlapping members. See IBC Sections 1604.2 and 2205.1, AISC 360-10 Section J2, and <br /> AISC 303-10 Section 3.1.2. Please see updated detail. The web members are not intended <br /> to overlap. They attach directly to vertical chord elements. The vertical chord elements <br /> start out in-plane at the base and offset at the top connection by the thickness of the angle <br /> (1/4"). Calculations show that using 1/2"offset creates such a small angle that the gap in <br /> the framing connection at the weld does not exceed the 1/16"allowance per the AWS. <br /> Additionally the maximum member end reaction is 4.1k (LRFD) requiring 1-1/2"of 1/8" <br /> Page 4 of 6 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax (425) 257-8857 <br />