4. SWPPP NARRATIVE <br /> The intent of this section is to provide the information necessary to support the <br /> engineering plans in order to implement a design that will; reduce, eliminate or prevent the <br /> discharge of stormwater pollutants, meet or exceed the water quality and sediment <br /> management standards for the City and State, and prevent adverse impacts to the <br /> receiving waters for this project. Note; this narrative is intended to support the SWPPP <br /> that is included with the Targeted Drainage Plans also a part of this submittal package to <br /> the City. <br /> A. SITE GRADING/EROSION CONTROL RISK ASSESSMENT <br /> Area proposed to be cleared/worked: < 6,000 sf <br /> Average slope: 10% (Area of Disturbance Only) <br /> Erosion Hazard of Soil Low <br /> Critical Areas downslope Yes <br /> Site is upstream of an ESA Stream Yes <br /> Based on the above information and the fact that the area to be disturbed is flat to <br /> moderately sloped and construction site runoff will pass through silt fencing and retained <br /> vegetation prior to leaving the City RNV, and that if site conditions warrant, additional <br /> BMP's can be implemented as corrective measures the Risk Category for this site is Low <br /> Risk. <br /> B. SWPPP MINIMUM ELEMENTS <br /> 1: Preserve Vegetation and Mark Clearing Limits <br /> The first step in the construction process is for the contractor to fence the limits of <br /> clearing/disturbance (BMP C103) prior to any other construction activity. The engineering <br /> plans locate and provide the square footages for the areas of grading, clearing, impervious <br /> surfaces and un-disturbed areas on the proposed short plat. As much of the natural <br /> vegetation as possible will be preserved on this project (BMP C101). <br /> 2: Establish Construction Access <br /> The SWPPP calls for the proposed construction entrance (BMP C105) to be installed as <br /> the second step after the staking of clearing limits. Since this project will utilize the <br /> existing site access on the property this feature will not require any excessive grading to <br /> install, will be available immediately and may require some maintenance to ensure proper <br /> function during the site work. At this time winter work is expected during the wet season. <br /> 3: Control Flow Rates <br /> This project is below the thresholds requiring flow control for the project. <br /> Royell Manufacturing 15-0714 <br /> July 2017 Page 7 <br />