My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY BLUE WATER DISTILLERY 2019-02-05
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
BLUE WATER DISTILLERY
>
1205 CRAFTSMAN WAY BLUE WATER DISTILLERY 2019-02-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 2:06:41 PM
Creation date
2/5/2019 2:06:37 PM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
BLUE WATER DISTILLERY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tony Lee <br /> From: Charles Johnstone /��S <br /> 6/11 Sent: Monday, October 23, 2017 10:54 AM ,p �G��Z'• I�lTo: Tony LeeV—J <br /> Subject: RE: New Hood <br /> Yes they have a small inside plastic HGI/grease trap in kitchen, but not an (in ground) interceptor. <br /> When his TI came up we wanted them to tie into the strip's grease waste line and 4000 gal GI that serves Scuttlebutt, <br /> Seas the Day coffee café, and I believe/hope the upstairs commissary kitchen. But there was not enough elevation drop <br /> in the distance from his kitchen across to the tenant space next door where the GW line evidently terminates. I believe <br /> their drains connect to the port sewer running along the back/east side of the building. <br /> C <br /> From:Tony Lee <br /> Sent: Monday, October 23, 2017 10:43 AM <br /> To:Charles Johnstone<CJohnstone@everettwa.gov>;Shellie Pons<SPons@everettwa.gov> <br /> Cc: Darold Walden<DWalden@everettwa.gov>;Jeff Kerwin<JKerwin@everettwa.gov> <br /> Subject: RE: New Hood <br /> Thanks Charles. I put our'contact IPT' stamp on the plans.We are pretty sure they don't have an interceptor. <br /> From: Charles Johnstone <br /> Sent: Monday, October 23, 2017 10:09 AM <br /> To: Tony Lee; Shellie Pons <br /> Cc: Darold Walden; Jeff Kerwin <br /> Subject: RE: New Hood <br /> I don't actually hav- -cord of IPT inspections there in the past. Churches must meet minimum requirements, but <br /> without ID'd problems ha �_:enerally been low priority for monitoring vs. commercial foodies. <br /> I can go pay them a visit if Jeff c Id like.Or you could let me know when led for an inspection on the hood and I <br /> could meet you there to confirm wha Iey have in place. <br /> I know the church has been there since 184: and I see se . connections last made in early'50s per GoSync. Looks like <br /> the sewer in alley was redone with utilities work'°_4-,'itt in 2003. I don't see anything on kitchen space in record <br /> drawings. But if the facilities included an inside ease ,. it was likely a steel one and could have long since been <br /> replaced or removed. Our only issue woul;:.e if they remov-, it at some point but without retrofitting in a new one. <br /> Charles <br /> X82224 <br /> From: . ' Lee <br /> Sent:Satur. .y, October 21, 2017 1:58 PM <br /> To:Charles Joh tone<CJohnstone • eve ettwa.:ov>;Shellie Pons<SPons@everettwa.gov>; Darold Walden <br /> <DWalden • evere wa.:ov> <br /> Subject: New Hood <br /> A new hood is going in at 29 •sckefeller—First Presbyterian Church <br /> The permit history suggests n exi 'ng kitchen and grease trap (like all churches) but not a commercial kitchen and <br /> grease interceptor.... <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.