My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9220 EVERGREEN WAY 2019-02-06
>
Address Records
>
EVERGREEN WAY
>
9220
>
9220 EVERGREEN WAY 2019-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 7:15:57 AM
Creation date
2/6/2019 7:15:55 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9220
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal <br /> ;woo <br /> RO PCORP PROPOSAL: 007775 DATE: 09/11/18 <br /> gt ar. ntte of qualityEverett Building <br /> P.O.Box 69315 Seattle,WA 98168 Reroof <br /> (206)439-9991 Fax(206)439-9995 <br /> CLIENT: 37145 PROJECT: 005597 <br /> Lowell/McIntosh CONTACT:Cindy Lowell Everett Building <br /> 1516 175th St SW PHONE: (206) 818-6518 9220 Evergreen Way <br /> Lynnwood, WA 98037 FAX: Everett, WA <br /> Work Specifications <br /> [A]PROJECT SUMMARY:Thank you for the opportunity to provide our proposal for roof replacement at the above referenced <br /> project. <br /> ROOF AREA; Entire roof.See attached drawing. <br /> ROOF WORK SUMMARY:Remove existing roof system and replace with TPO membrane, <br /> [B]QUALITY ASSURANCE:As a certified manufacturer warranted installer,ROOFCORP is dedicated to maintaining high quality <br /> standards of workmanship and professionalism, including the following: <br /> 1, WARRANTY MANUFACTURER:20 Year NDL labor and material,per the manufacturer's written warranty. <br /> 2. ANNUAL INSPECTION:Each year for the first(2)years ROOFCORP will perform annual roof inspection to ensure roof is <br /> performing as intended and in compliance with warranty maintenance requirements. <br /> 3. PERFORMANCE BOND:An independent surety bonding company has pre-approved ROOFCORP for a performance bond on <br /> this project. Upon request,a performance will be provided at additional cost. <br /> 4. INSURANCE:All work to be covered by Workmen's Compensation and$6,000,000 of Auto, Public Liability, Property Damage, <br /> Products Liability and Completed Operations Insurance.Customer may be named as a certificate holder upon request,subject to <br /> additional charges and availability of coverage. <br /> 5. SAFETY: In commitment to safety ROOFCORP shall be responsible to comply with all applicable local, state and federal <br /> requirements that are safety related, <br /> 6. UL RATED ROOF COVERING:Roof covering materials must be installed in accordance with UL 790(ASTM E1081 to be fire <br /> rated assemblies.The materials in existing roof systems are assumed to be installed in accordance with their listing and the <br /> manufacturers'installation instructions.The system we have proposed has been rated as a UL Class"A" roof covering assembly, <br /> [C]SCOPE OF WORK: Provide labor,materials and supervision per the following spef ifications; <br /> 1. TEAR OFF:Tear off existing roof system and haul away. All removed materials shall be directed to truck or dumpster via tear <br /> off chute or hoist with container.This will protect the structure, property;walls and general work area from damage while at the, <br /> same time enhance job site safety. <br /> 2. INSULATION OR UNDERLAYMENT: Install%'Densdeck over entire roof area.All layers will be fastened to manufacturer's <br /> requirements for proposed roofing system. <br /> 3. SCUPPER DRAINS: The existing scupper drain holes will have new 24g scuppers installed.The scuppers will be of same <br /> shape and design as the existing. <br /> 4. ROOFING SYSTEM: Install per manufacturer's specifications, a Carlisle SureWeld TPO.060""'reinforced Thermoplastic <br /> Polyolefin White membrane.All flashing details will be completed to manufacturer requirements. <br /> 5. PENETRATION FLASHINGS: Install new TPO boot flashings at plumbing vents, heater Stacks and electrical pipe <br /> penetrations. <br /> 6. VERTICAL SURFACES: Roofing shall be installed up vertical surfaces and terminated at top outside edge of wall or at fixedt)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.