Proposal Page 2 <br /> Work Specifications <br /> metal flashing as required. <br /> 7. WALL COPING: Re-install existing metal parapet wall coping after roofing has been completed. <br /> 8. MECHANICAL EQUIPMENT:Units on open curb shall be roofed up and under existing fixed flashing.All duct flashings shall <br /> be re-used and flashed in per manufacturer requirements.All costs for unit disconnects or additional work not described above or <br /> mandated by the building department shall be invoiced as extra work. <br /> 9. CLEAN UP:During the course of this work ROOFCQRP shall use all means necessary to maintain the work area in a clean, <br /> safe,and orderly manner. <br /> [DJ EXCLUSIONS: Base bid figure excludes any work not described above,carpentry work or re-sloping of deck,painting or other <br /> waterproofing,Mechanical Work, Electrical Work,Wood Work,City Permits, Fire department Permits and WSST, Please note <br /> that roofing substrates may require additional testing such as pull out tests for wind up-lift requirements.Our proposal does not <br /> include testing or upgrade to roof covering due to test failure. <br /> [EJ PERMIT AND INSPECTION FEES:Customer shall pay all building permit,inspection and/or access fees required plus$75,00 <br /> for issuance costs.Please note that many cities have demolition recycling ordinances and the fees or deposits required are not <br /> included. <br /> [F]EXTRA WORK:If during the work process additional work is discovered,the contractor will immediately notify the owner.Any <br /> extra labor connected with repair work will be billed on a time($74.50 per man hour)and(material plus 20%markup)basis. <br /> [G]TIME FOR STARTING&COMPLETION:To be negotiated upon contract signing. <br /> [H]TERMS&CONDITIONS:This proposal is subject to the attached Terms&Conditions, Because firm prices cannot be <br /> obtained from suppliers,prices are subject to change if not accepted within 30 days. <br /> [I]PAYMENT:Progress billing on the 30th of every month <br /> [J}PRICE: Provide all equipment, labor and materials herein described,for the contract sum of: <br /> TOTAL BID $34,754 <br /> 1 , <br /> , , <br /> , - i / / <br /> ) i' ' PI ' at ' / <br /> k,,,,. <br /> 1 0 I II <br /> 1 1 <br /> __. <br /> ---)J3 <br /> Y <br />