My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.4. COMPENSATION TO OWNER FOR TIME EXTENSION ' <br /> The Owner shall be compensated by the Contractor for the actual costs to the Owner of engineering, <br /> inspection, general supervision, right-of-way costs, permit fees, overhead expenses, and any other <br /> ascertainable direct costs to the Owner which are directly chargeable to the work and which accrue <br /> during the period of such extension. The actual costs do not include charges for final inspection and <br /> preparation of the final payment by the Owner. 1119.5. ADJUSTMENT OF CONTRACT SUM <br /> 9.5.1 Calculation <br /> Except as otherwise expressly provided in these General Conditions, any and all adjustments of Contract <br /> Sum shall be determined as follows: <br /> 1. If the parties are able to agree,the price will be determined by using: <br /> 111 <br /> a. Unit prices, if the work items are defined by unit prices; and <br /> b. Other prices agreed upon by the Contractor and Owner for work not defined by <br /> unit prices. <br /> 2. If the parties cannot agree, the Owner's Representative will determine the price pursuant <br /> to the following order: <br /> a. Unit prices, if the work items are defined by unit prices; and <br /> b. Other means to establish the reasonable cost of the work if it is not defined by <br /> unit prices, including, but not limited to, Force Account as described in section <br /> 9.6. Force Account, the Schedule of Values, or estimating manuals. <br /> 9.5.2 Limitations <br /> The following limitations shall apply in determining the amount of an adjustment: ' <br /> 1. Except as otherwise expressly provided, Contractor will only be paid for costs it clearly <br /> and convincingly proves it actually and directly incurred, and shall not include <br /> consequential or indirect damages not otherwise expressly permitted by the Contract <br /> Documents. Costs and damages for which Owner shall not be liable under any <br /> circumstances include, but are not limited to: (a) borrowing or interest costs, charges, or <br /> expenses of Contractor; (b) alleged lost profit or overhead on any other project; and (c) <br /> Contractor's failure or inability to obtain other work. <br /> 2. No Contract Claim for adjustment of Contract Sum or additional compensation for extra, <br /> affected, impacted or inefficient work will be allowed where the Contractor does not keep <br /> and maintain contemporaneous, complete and accurate time records for labor and <br /> Equipment and contemporaneous, complete and accurate records for materials and <br /> where such records do not contemporaneously segregate and allocate by time, location <br /> and work the time and costs for each item or element of such work. Contractor's failure to <br /> keep and maintain such records constitutes a waiver of any Contract Claim or request by <br /> the Contractor for adjustment of Contract Sum for such costs or event. <br /> 3. To the extent the Contractor is entitled to an adjustment of Contract Sum due to any <br /> Delay or extension of Contract Time,Contractor shall be compensated as provided in <br /> section 12.3 Contract Claim Remedies. Such compensation shall be full, adequate and <br /> complete compensation for all direct, indirect, cumulative, inefficiency, impact and ripple <br /> costs causing, arising out of, or relating to such delays or extension. <br /> 4. Contractor and Owner agree that compensation to the Contractor for a Contract Claim <br /> shall not exceed the Contractor's costs based upon Force Account as described in <br /> section 9.6. Force Account. Contractor waives, releases, and agrees not to submit any <br /> request for adjustment of Contract Sum or Contract Claim based upon a"total cost" or <br /> EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS ' <br /> PHASE 3 <br /> 00710-34 <br />