Laserfiche WebLink
"modified total cost"calculation, in whole or in part, but instead agrees that any and all <br /> requests for compensation shall be based upon accurate, complete and <br /> contemporaneous cost records that segregate and allocate costs(a) between base <br /> ' Contract work and the work for which additional compensation is sought and (b) between <br /> each item of work for which additional compensation is sought. Claims for inefficiency <br /> shall only be based and calculated by a comparison of productivity of similar work <br /> performed in an unaffected or least affected area of the Project. <br /> 5. No claim for consequential damages of any kind will be allowed. <br /> 9.5.3 Unabsorbed and Extended Overhead <br /> A. Any Extended or Unabsorbed Overhead to which the Contractor may be entitled shall be <br /> calculated using the Eichleay formula by: <br /> ' 1. Determining the pro-rata amount of Overhead allocable to the subject project. This is <br /> accomplished by multiplying Overhead costs by the ratio of the subject project's billings <br /> to the Contractor's overall billings during the overall period of the subject Project's <br /> performance. The result is"Allocable Overhead." <br /> ' Any additional and unresolved direct cost claims presented by the Contractor <br /> concurrently with any request for Extended and/or Unabsorbed Overhead shall not be <br /> included in determining the ratio of the subject Project billings to overall Contractor <br /> ' billings for the period of project performance. <br /> 2. Determining the daily amount of Allocable Overhead for the subject Project. This is <br /> accomplished by dividing the Allocable Overhead for the subject Project by the number of <br /> days(as contractually defined)of Contract performance. The result is the Daily Rate of <br /> Allocable Overhead. <br /> 3. Determining the gross amount of potential additional compensation for Home Office <br /> ' Overhead due to the project extension. This is accomplished by multiplying the Daily <br /> Rate of Allocable Overhead by the number of days of project extension caused solely by <br /> the City. This results in the Gross Amount of Additional Home Office Overhead <br /> Compensation. <br /> 4. Adjusting the Gross Amount of Additional Home Office Overhead Compensation for any <br /> additional contribution for Overhead received by the Contractor on any Change Orders <br /> that are being presented and resolved concurrently with the subject calculation for <br /> ' Unabsorbed and/or Extended Home Office Overhead. The necessary adjustment would <br /> be to reduce the Gross Amount of Additional Home Office Overhead Compensation by <br /> any additional compensation for Overhead included in any direct cost claims being <br /> resolved concurrently with any claim for Extended and/or Unabsorbed Home Office <br /> Overhead. <br /> B. Contractor shall not receive compensation for cost of use of equity capital. <br /> 9.6. FORCE ACCOUNT <br /> If work or materials are to be paid for by Force Account, payment amounts will be determined and <br /> ' Contractor shall contemporaneously prepare, keep and maintain records segregated and allocated by <br /> time, location and item of work in compliance with this subsection. Such records must be <br /> contemporaneously countersigned by the Owner or the Owner's Representative (or its designee). Any <br /> records not countersigned by the Owner or Owners Representative shall be excluded from the <br /> calculation of payment under this subsection. <br /> The payments provided for herein shall be full payment for all work done on a Force Account basis. The <br /> payment shall be deemed to cover all expenses of every nature, kind, and description, including all <br /> overhead expenses, profit, occupational tax and any other Federal or State revenue acts, premiums on <br /> public liability and property damage insurance policies, and for the use of small tools and Equipment for <br /> which no rental is allowed. <br /> EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> ' 00710-35 <br />