My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> are not available for materials from the Contractor stocks, the Contractor shall certify <br /> actual costs by affidavit. <br /> I If Contract Claims for materials costs are too high, inappropriate, or unsupported by satisfactory <br /> evidence, the Owner's Representative may determine the cost for all or part of the materials. <br /> When determined in this manner, the cost will be the lowest current wholesale price from a <br /> source that can supply the required quantity(including delivery costs). <br /> IThe Owner reserves the right to provide materials. If so, the Contractor will receive no payment <br /> for any costs, overhead, or profit on such materials. <br /> I <br /> 9.6.3. Equipment <br /> The Equipment rates shall be actual cost but shall not exceed the rates set forth in the <br /> AGC/WSDOT Equipment Rental Agreement in effect at the time the work is performed, <br /> I <br /> The approval of the Owner's Representative shall be required for the selection of machine-power <br /> tools or Equipment prior to their use in Force Account situations. <br /> The payment for any machine-power tools or Equipment shall be made according to the current <br /> I <br /> AGC/WSDOT Equipment Rental Agreement in effect at the time the Force Account is authorized. <br /> The rates as set forth in the Rental Rate Blue Book(as modified by the current AGC/WSDOT <br /> Equipment Rental Agreement)are the maximum rates allowable for Equipment of modern design <br /> and in good working condition. These rates shall be full compensation for all fuel, oil, lubrication, <br /> I <br /> repairs, maintenance, and all other costs incidental to furnishing and operating the Equipment <br /> except labor for operation. <br /> The Owner will add Twenty-one(21) percent to Equipment costs to cover Project overhead, <br /> I <br /> general company overhead (excluding Equipment overhead included in the Rental Rate Blue <br /> Book), and profit. <br /> Current copies of the Rental Rate Blue Book and the AGC/WSDOT Equipment Rental Agreement <br /> I <br /> will be maintained at each Region office of the Washington State Department of Transportation <br /> and at each of the offices of the Associated General Contractors of America (in Seattle, Spokane, <br /> Tacoma, and Wilsonville, Oregon)where they are available for inspection. <br /> I 9.6.4 For Services. <br /> Compensation under force account for specialized services shall be made on the basis of an <br /> invoice from the providing entity. A"specialized service"shall be one that is typically billed <br /> ' through invoice in standard industry practice. Before work is started, the Engineer may require <br /> the Contractor to obtain multiple quotations for the service to be utilized and select the provider <br /> with prices and terms most advantageous to the Contracting Agency. In the event that prior <br /> I <br /> quotations are not obtained and the service invoice is submitted by the subcontractor, then after- <br /> the-fact quotations may be obtained by the Engineer from the open market in the vicinity and the <br /> lowest such quotation may be used in place of the submitted invoice. <br /> Except as noted below, the Contracting Agency will pay the Contractor an additional Twenty-one <br /> I (21) percent of the sum of the costs included on invoices for specialized services to cover project <br /> overhead, general company overhead, profit, bonding, insurance, Business&Occupation tax, <br /> and any other costs incurred. <br /> I <br /> When a supplier of services is compensated through invoice, but acts in the manner of <br /> subcontractor, as described in Section 6 of this provision, then markup for that invoice shall be <br /> according to Section 6. "Contractor Markup of Subcontractors Work". <br /> I9.6.5 For Mobilization. <br /> I Force Account mobilization is defined as the preparatory work performed by the Contractor <br /> including procurement, loading and transportation of tools and equipment, and personal travel <br /> time(when such travel time is a contractual obligation of the Contractor or a customary payment <br /> 1 EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> I00710-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.