My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I3. The specific day and dates of use or standby; <br /> 4. Job overhead. <br /> I 5. Overhead (general and administrative). <br /> 6. Subcontractor's Contract Claims(in the same level of detail as specified <br /> herein is required for any subcontractor's Contract Claims); and <br /> I7. Other categories as specified by the Contractor or the Owner. <br /> 10. A notarized statement shall be submitted to the Owner's Representative containing the <br /> following language: <br /> IUnder the penalty of law for perjury or falsification, the undersigned, <br /> I (name) (title) <br /> of <br /> I (company) <br /> I hereby certifies that the Contract Claim for extra compensation and extension of Contract <br /> Time, if any, made herein for work on this Contract is a true and complete statement of <br /> the factual basis of the Contract Claim and all actual costs incurred and time sought, and <br /> is fully documented and supported under the Contract between the parties. <br /> IDate /s/ <br /> Subscribed and sworn before me this day of <br /> INotary Public <br /> My Commission Expires: <br /> I12.3 FALSE OR OMITTED INFORMATION <br /> The Contractor waives each Contract Claim for which it presents material information that it knows, or in <br /> Ithe exercise of reasonable care should know, is false, or omits or fails to disclose material information <br /> relating to such Contract Claim. In such case, Contractor shall reimburse the City for any and all fees and <br /> expenses incurred in investigating any such Contract Claim. <br /> 12.4 REMEDIES <br /> 12.4.1 General <br /> I If a Contract Claim has merit in whole or in part, then Contractor's sole remedies shall be those provided <br /> in this subsection. Contractor must timely and strictly comply with the requirements of section 10. <br /> NOTICE TO OWNER, section 12. CONTRACT CLAIMS and all other General Conditions relating to the <br /> I Contract Claim. Adjustments to Contract Time shall be determined pursuant to section 5.2.2.2 <br /> Extensions of Contract Time. Failure to comply strictly and timely shall be deemed a waiver of the <br /> Contract Claim. <br /> I 12.4.2 Extra Work <br /> 12.4.2.1 Adjustment of Contract Sum <br /> If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work, the adjustment shall <br /> I be calculated and paid as provided in section 9.5. Adjustment of Contract Sum. This amount includes <br /> jobsite and home office overheads for such work, including any schedule delays relating to such work. <br /> IEVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.