My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Therefore, no compensation in addition to that provided in section 9.6. Force Account shall be paid for <br /> such thing as extended overhead or other costs or damages. <br /> 12.4.2.2 Extension of Contract Time <br /> Extensions of Contract Time caused by Extra Work shall be determined as provided in section 5.2.2.2 <br /> Extensions of Contract Time. <br /> 12.4.3 Delays <br /> 12.4.3.1 Owner Caused Delay Unrelated to Extra Work <br /> 12.4.3.1.1 Adjustment of Contract Sum <br /> If the Contractor is entitled to an adjustment of Contract Sum because of a Delay solely caused by the ' <br /> Owner that does not relate to Extra Work, Contractor shall only be compensated for the items below, less <br /> all funds paid pursuant to any change in the Contract Sum that contributed to the Delay: <br /> A. Documented, incurred cost of nonproductive field supervision or labor extended because , 1 <br /> of the delay; <br /> B. Documented, incurred cost of home office supervision to attend jobsite meetings; <br /> C. Documented, incurred cost of temporary facilities or Equipment rental extended because <br /> of the delay; <br /> D. Documented, incurred cost of insu!ance extended because of the delay; <br /> E. General and administrative overhead in an amount to be agreed upon, but not to exceed <br /> three percent(3%)of original Contract Sum divided by the Contract Time for each day of <br /> the delay. <br /> Owner shall not owe Contractor compensation for extended overhead or other delay costs where <br /> Contractor contributed to or is concurrently responsible for the delay. <br /> 12.4.3.1.2 Adjustment of Contract Time <br /> If the Contractor is entitled to an adjustment of Contract Time because of a Delay solely caused by the <br /> Owner that does not relate to Extra Work, Contractor shall be entitled to an adjustment of Contract Time <br /> to the extent the Delay increases the duration of the Project, as measured by the critical path and as <br /> demonstrated pursuant to the requirements of section 5.2.2.2 Extensions of Contract Time. <br /> 12.4.3.2 Contractor Caused Delay <br /> If the Contractor is solely responsible for any Delay to any interim milestone, Substantial Completion, <br /> Physical Completion or the Completion Date, the City shall be entitled to liquidated or other damages as <br /> provided elsewhere in the Contract Documents. The Contractor accepts the risk of any Delays caused by <br /> strikes, work slowdowns,job actions and labor unrest of any kind. Contractor shall not be entitled to any <br /> increase in Contract Sum or Contract Time due to a Delay it caused. <br /> 12.4.3.3 Delays Concurrently Caused by Contractor and City <br /> If the City and the Contractor cause a Delay concurrently, neither the City nor the Contractor shall be <br /> liable to the other except as provided herein. <br /> 12.4.3.3.1 Adjustment of Contract Sum <br /> The Contractor shall not be entitled to any adjustment in Contract Sum for Delays concurrently caused by <br /> the City and the Contractor. <br /> 12.4.3.3.2 Adjustment of Contract Time <br /> The Contractor shall be entitled to an extension of Contract Time for the City caused portion of any Delay ' <br /> concurrently caused by the City and Contractor to the extent the City caused the Delay to extend longer <br /> than if the Contractor had solely caused the Delay. <br /> 12.4.3.4 Third Party Caused Delays and Force Majeure ' <br /> 12.4.3.4.1 Caused Solely by Third Parties or Force Majeure <br /> EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.