My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> equipment, each potential subcontractor or suppler shall be notified by the Contractor of the 1 <br /> Contractor's obligations under this Contract. <br /> c. The Contractor shall provide all information and reports required by federal regulations <br /> applicable to this Contract. The Contractor shall permit access to its books, records, <br /> accounts, other sources of information, and its facilities as may be determined by the City to <br /> be pertinent to ascertain compliance with applicable federal regulations. Where any <br /> information required of a Contractor is in the exclusive possession of another who fails or <br /> refuses to furnish this information, the Contractor shall so certify to the City, and shall set <br /> forth what efforts it has made to obtain the information. <br /> d. In the event of the Contractor's noncompliance with the nondiscrimination provisions of this <br /> Contract, the City shall impose such contract sanctions as it, or the City's funding agencies, <br /> may determine to be appropriate, including, but not limited to: (a)withholding of payments to <br /> the Contractor until the Contractor complies, and/or(b)termination or suspension of the <br /> contract, in whole or in part. <br /> e. The Contractor shall include the provisions of paragraphs(a)through (e) in every <br /> subcontract, including contracts for procurement and leases of equipment, unless exempt by <br /> applicable federal regulations or directives issued pursuant thereto. The Contractor shall take <br /> such action, including sanctions for noncompliance,with respect to any subcontractor as the <br /> City or relevant federal agency may direct so as to enforce such provisions. Provided, <br /> however, in the event a Contractor becomes involved in, or is threatened with, litigation with a <br /> subcontractor or supplier as a result of the foregoing direction, the Contractor may request <br /> that the City or the United States to enter into such litigation to protect their respective <br /> interests. <br /> 111 <br /> 18.8 COMPLETE AGREEMENT <br /> These Contract Documents contain the complete and integrated understanding and Agreement between <br /> the parties and supersedes any understanding, agreement or negotiation, whether oral or written, not set <br /> forth herein. <br /> 18.9 SUCCESSORS BOUND I <br /> The grants, covenants, provisions and claims, rights, powers, privileges and liabilities contained in the <br /> Contract Documents shall be read and held as made by and with, and granted to and imposed upon, the <br /> Contractor and the Owner and their respective heirs, executors, administrators, successors and assigns. <br /> 18.10 EFFECTIVE DATE <br /> When duly executed by both the City and Contractor, this Agreement shall be effective as of the date the <br /> Contract(Section 00500) is signed by the Mayor of the City of Everett. <br /> 18.10 CONTRACTOR REGISTRATION I <br /> Contractor represents and warrants it is a contractor duly registered and in good standing with the <br /> Washington State Department of Labor and Industries. <br /> 18.11 LIMITATIONS ON ENGINEER'S AUTHORITY AND RESPONSIBILITIES <br /> A. Neither Engineer's authority or responsibility under this Paragraph 18.11 or under any other provi- <br /> sion of the Contract Documents nor any decision made by Engineer in good faith either to <br /> exercise or not exercise such authority or responsibility or the undertaking, exercise, or <br /> performance of any authority or responsibility by Engineer shall create, impose, or give rise to any <br /> EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS 1 <br /> PHASE 3 <br /> 00710-56 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.