Laserfiche WebLink
I <br /> I duty in contract, tort, or otherwise owed by Engineer to Contractor, any Subcontractor, any <br /> Supplier, any other individual or entity, or to any surety for or employee or agent of any of them. <br /> B. Engineer will not supervise, direct, control, or have authority over or be responsible for <br /> I Contractor's means, methods, techniques, sequences, or procedures of construction, or the <br /> safety precautions and programs incident thereto, or for any failure of Contractor to comply with <br /> Laws and Regulations applicable to the performance of the Work. Engineer will not be respon- <br /> I C. sible for Contractor's failure to perform the Work in accordance with the Contract Documents. <br /> Engineer will not be responsible for the acts or omissions of Contractor or of any Subcontractor, <br /> any Supplier, or of any other individual or entity performing any of the Work. <br /> I <br /> END OF SECTION <br /> I <br /> I <br /> I <br /> 1 <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> I EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-57 <br /> I <br />