My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNOHOMISH COUNTY <br /> EFFECTIVE 3-03-2043 <br /> (See Benefit Code Key) <br /> 111 <br /> Over <br /> PREVAILING Time Holiday Note <br /> Classification WAGE Code Code Code <br /> GRADE CHECKER&TRANSIT PERSON $41.28 1H 5D <br /> GRINDERS $40.03 1H 5D <br /> GROUT MACHINE TENDER $40.03 1H 5D <br /> GUARDRAIL ERECTOR $40.03 1H 5D <br /> HAZARDOUS WASTE WORKER LEVEL A $41.28 1H 5D <br /> HAZARDOUS WASTE WORKER LEVEL B $40.77 1H 5D <br /> I <br /> HAZARDOUS WASTE WORKER LEVEL C $40.03 1H 5D <br /> HIGH SCALER $41.28 1H 5D <br /> HOD CARRIER/MORTARMAN $41.28 1H 5D <br /> JACKHAMMER $40.77 1H 5D <br /> LASER BEAM OPERATOR $40.77 1H 5D <br /> MANHOLE BUILDER-MUDMAN $40.77 1H 5D <br /> MATERIAL YARDMAN $40.03 1H 5D <br /> I <br /> MINER $41.28 1H 5D <br /> NOZZLEMAN,CONCRETE PUMP,GREEN CUTTER WHEN USING HIGH $40.77 1H 5D <br /> PRESSURE AIR&WATER ON CONCRETE&ROCK,SANDBLAST, <br /> GUNITE,SHOTCRETE,WATER BLASTER <br /> PAVEMENT BREAKER $40.77 1H 5D <br /> PILOT CAR $33.93 1H 5D <br /> PIPE POT TENDER $40.77 1H 5D <br /> PIPE RELINER(NOT INSERT TYPE) $40.77 1H 5D <br /> PIPELAYER&CAULKER $40.77 1H 5D <br /> PIPELAYER&CAULKER(LEAD) $41.28 1H 5D <br /> PIPEWRAPPER $40.77 1H 50 <br /> POT TENDER $40.03 1H 5D <br /> POWDERMAN $41.28 1H 5D <br /> POWDERMAN HELPER $40.03 1H 5D <br /> POWERJACKS $40.77 1H 5D <br /> RAILROAD SPIKE PULLER(POWER) $40.77 1H SD <br /> RE-TIMBERMAN $41.28 1H 5D <br /> RIPRAP MAN $40.03 1H 50 <br /> RODDER $40.77 1H 5D <br /> SCAFFOLD ERECTOR $40.03 1H 50 <br /> SCALE PERSON $40.03 1H 5D <br /> SIGNALMAN $40.03 1H 5D ' <br /> SLOPER(OVER 20') $40.77 1H 5D <br /> SLOPER SPRAYMAN $40.03 1H 5D <br /> SPREADER(CLARY POWER OR SIMILAR TYPES) $40.77 1H 5D <br /> SPREADER(CONCRETE) $40.77 1H 5D <br /> STAKE HOPPER $40.03 1H 5D <br /> STOCKPILER $40.03 1H 5D <br /> TAMPER&SIMILAR ELECTRIC,AIR&GAS $40.77 1H 5D <br /> II <br /> TAMPER(MULTIPLE&SELF PROPELLED) $40.77 1H 5D <br /> TOOLROOM MAN(AT JOB SITE) $40.03 1H 5D <br /> TOPPER-TAILER $40.03 1H 5D <br /> TRACK LABORER $40.03 1H 5D <br /> TRACK LINER(POWER) $40.77 1H 5D <br /> TRUCK SPOTTER $40.03 1H 5D <br /> TUGGER OPERATOR $40.77 1H 5D <br /> VIBRATING SCREED(AIR,GAS,OR ELECTRIC) $40.03 1H 5D <br /> VIBRATOR $40.77 1H 5D <br /> VINYL SEAMER $40.03 1H 5D <br /> 111 <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.