My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 SNOHOMISH COUNTY <br /> EFFECTIVE 3-03-2010 "=,►t• <br /> (See Benefit Code Key) <br /> Over <br /> PREVAILING Time Holiday Note <br /> Classification WAGE Code Code Code <br /> WELDER $40.03 1H 5D <br /> WELL-POINT LABORER $40.77 1H 5D <br /> I LABORERS-UNDERGROUND SEWER&WATER <br /> GENERAL LABORER 8 TOPMAN $40.03 1H 5D <br /> PIPE LAYER $40.77 1H 5D <br /> I LANDSCAPE CONSTRUCTION <br /> IRRIGATION OR LAWN SPRINKLER INSTALLERS $17.31 1 <br /> LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $20.06 1 <br /> LANDSCAPING OR PLANTING LABORERS $14.13 1 <br /> I LATHERS <br /> JOURNEY LEVEL $48.74 1H 5D <br /> MARBLE SETTERS <br /> I JOURNEY LEVEL $46.35 1M 5A <br /> METAL FABRICATION(IN SHOP) <br /> FITTER/WELDER $15.38 1 <br /> LABORER $9.79 1 <br /> 1 MACHINE OPERATOR $8.84 1 <br /> PAINTER $9.98 1 <br /> MODULAR BUILDINGS <br /> I JOURNEY LEVEL $9.00 1 <br /> PAINTERS <br /> JOURNEY LEVEL $34.87 2B 6Z <br /> PLASTERERS <br /> I JOURNEY LEVEL $46.63 1R 5B <br /> PLAYGROUND&PARK EQUIPMENT INSTALLERS <br /> JOURNEY LEVEL $11.94 1 <br /> I PLUMBERS&PIPEFITTERS <br /> JOURNEY LEVEL $56.07 1G 5A <br /> POWER EQUIPMENT OPERATORS <br /> ASPHALT PLANT OPERATOR $50.39 1T 5D " 8P <br /> I ASSISTANT ENGINEERS $47.12 1T 5D 8P <br /> BACKHOE,EXCAVATOR SHOVEL,OVER 50 METRIC TONS TO 90 METRIC $50.94 1T 5D 8P <br /> TONS <br /> BACKHOE,EXCAVATOR SHOVEL,OVER 90 METRIC TONS $51.51 1T 5D 8P <br /> I BACKHOE,EXCAVATOR,SHOVEL,OVER 30 METRIC TONS TO 50 $50.39 1T 5D 8P <br /> METRIC TONS <br /> BACKHOE,EXCAVATOR,SHOVEL,TRACTORS UNDER 15 METRIC TONS $49.48 1T 5D 8P <br /> I BACKHOE,EXCAVATOR,SHOVEL,TRACTORS: 15 TO 30 METRIC TONS $49.90 1T 5D 8P <br /> BARRIER MACHINE(ZIPPER) $49.90 1T 5D 8P <br /> BATCH PLANT OPERATOR,CONCRETE $49.90 1T 5D 8P <br /> BELT LOADERS(ELEVATING TYPE) $49.48 1T 50 8P <br /> I BOBCAT(SKID STEER) $47.12 1T 5D 8P <br /> BROKK-REMOTE DEMOLITION EQUIPMENT $47.12 1T 5D 8P <br /> BROOMS $47.12 1T 5D 8P <br /> II BUMP CUTTER $49.90 1T 5D 8P <br /> CABLEWAYS $50.39 1T 5D 8P <br /> CHIPPER $49.90 1T 50 8P <br /> COMPRESSORS $47.12 1T 5D 8P <br /> CONCRETE FINISH MACHINE-LASER SCREED $47.12 1T 5D 8P <br /> CONCRETE PUMPS $49.48 1T 5D 8P <br /> CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT $49.90 1T 5D 8P <br /> I CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42 <br /> $50.39 1T 50 8P <br /> METERS <br /> Page 5 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.