My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> PREVAILING WAGE RATES <br /> FOR <br /> i <br /> SNOHOMISH COUNTY <br /> APPRENTICES <br /> EFFECTIVE DATE I <br /> 3/3/2010 <br /> Prevailing Overtime Holiday Note <br /> Stage of Progression&Hour Range Wage Code Code Code <br /> PLASTERERS <br /> JOURNEY LEVEL. <br /> I <br /> 1 0000-1000 HOURS 50.000/0 $24.78 1R 5B <br /> 2 1001-2000 HOURS 50.00% $31.53 1R 5B <br /> 3 2001-3000 HOURS 60.00% $34.55 1R 5B <br /> 4 3001-4000 HOURS 70.00% $37.57 1R 58 <br /> 5 4001-5000 HOURS 80.00% $40.59 1R 58 <br /> 6 5001-6000 HOURS 90.00% $43.61 1R 5B <br /> 7 6001-7000 HOURS 95.00% $45.12 1R 5B <br /> PLUMBERS&PIPEFITTERS <br /> JOURNEY LEVEL <br /> 1 0000-1000 HOURS 50.00% $32.27 1G 5A <br /> I <br /> 2 1001-2000 HOURS 55.00% $34.54 1G 5A <br /> 3 2001-3000 HOURS 60.00% $37.42 1G 5A <br /> 4 3001-4000 HOURS 65.00% $39.76 1G 5A <br /> 5 4001-5000 HOURS 70.00% $42.09 1G 5A <br /> 6 5001-6000 HOURS 75.00% $44.42 1G 5A <br /> 7 6001-7000 HOURS 80.00% $46.74 1G 5A 1118 7001-8000 HOURS 85.00% $49.07 1G 5A <br /> 9 8001-9000 HOURS 90.00% $51.41 1G 5A <br /> 10 9001-10000 HOURS 90.00% $51.41 1G 5A <br /> POWER EQUIPMENT OPERATORS <br /> EQUIPMENT SERVICE ENGINEER(OILER) <br /> ALL EQUIPMENT <br /> 1 0000-1000 HOURS 65.00% $37.46 1T 50 8P <br /> I <br /> 2 1001-2000 HOURS 70.00% $39.18 1T 5D 8P <br /> 3 2001-3000 HOURS 75.00% $40.90 1T 5D 8P <br /> 4 3001-4000 HOURS 80.00% $42.61 1T 5D 8P <br /> 5 4001-5000 HOURS 90.00% $46.05 1T 5D 8P <br /> 6 5001-6000 HOURS 95.00% $47.76 1T 5D 8P <br /> POWER LINE CLEARANCE TREE TRIMMERS <br /> TREE TRIMMED <br /> I <br /> 1 0000-1000 HOURS 75.00% $28.89 4A 5A <br /> 2 1001-2000 HOURS 80.00% $30.25 4A 5A <br /> 3 2001-3000 HOURS 85.00% $31.60 4A 5A <br /> 4 3001-4000 HOURS 90.00% $32.97 4A 5A <br /> REFRIGERATION&AIR CONDITIONING MECHANICS <br /> MECHANIC <br /> 1 0000-1000 HOURS 50.00% $32.27 1G 5A <br /> 2 1001-2000 HOURS 55.00% $34.54 1G 5A <br /> 3 2001-3000 HOURS 60.00% $37.42 1G 5A <br /> I <br /> 4 3001-4000 HOURS 65.00% $39.76 1G 5A <br /> 5 4001-5000 HOURS 70.00% $42.09 1G 5A <br /> 6 5001-6000 HOURS 75.00% $44.42 1G 5A <br /> Page 6 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.