Laserfiche WebLink
' I <br /> INSTRUCTIONS TO BIDDERS <br /> 1.1 General Description and Location of Project <br /> The workperformed will includes, but isnot limited <br /> to be to, installation and maintenance of <br /> erosion control best-management-practices, removal of contaminated soil material and hauling to <br /> I an approved off-site facility, re-grading of the site, salvage and placement of borrow, demolition <br /> of existing walls, cement augmentation of the finished surface, and modifications to the <br /> abandoned Lift Station 20, and furnishing all labor, materials and equipment necessary to <br /> I perform all work as required by the contract in accordance with the Contract Plans, <br /> Specifications and Standard Specifications, all of which are made a part hereof. <br /> The project site is located within the Everett Landfill east of I-5 and west of the Snohomish <br /> IRiver, and south of 36th Street. The project site also includes the "GTS Drywall" site just north <br /> of 36th Street and east of the BNSF right of way. See Section 01060—Regulatory Requirements <br /> IIIfor description of project easements. <br /> II' 1.2 Design Engineer <br /> ineer <br /> 1 Questions and inquiries about these Specifications and Contract Plans should be directed to the <br /> attention of Tim Marks, P.E., City of Everett Project Manager at (425) 257-8872. If Tim Marks <br /> is not available, contact Mark Holmes at Perteet, Inc., at(425)252-7700. <br /> III 1.3 Standard Specifications <br /> I The following other specifications and standard plans shall apply to the extent to which they are <br /> called out in these plans and specifications. <br /> 1 1. WSDOT "2010 Standard Specifications for Road, Bridge and Municipal Construction", <br /> as amended by the APWA Supplements, hereinafter referred to as the "Standard <br /> Specifications." <br /> I 2. City of Everett"Design and Construction Standards and Specifications" <br /> (Revised 1-08). <br /> 1 3. "Standard Plans for Road and Bridge Construction,"as prepared by WSDOT. <br /> 4. "Manual on Uniform Traffic Control Devices" (MUTCD). <br /> 1 5. APWA Standards. <br /> 6. AWWA Standards. <br /> I <br /> 1.4 Filling in Proposal Forms <br /> IBidders must submit proposals on the forms found in the proposal specifications. All blank <br /> spaces in the proposal form shall be properly filled in. In addition to writing in the bid amount in <br /> I numbers, be sure and write out the bid in words in the space provided in the Proposal. Where <br /> conflict occurs, the written or typed words shall prevail. Do not qualify bids, since this will <br /> automatically be cause for rejection of the bid. <br /> I 1.5 Withdrawal of Proposal <br /> EVERETT RIVERFRONT SURCHARGE INSTRUCTIONS TO BIDDERS <br /> PHASE 3 <br /> 111 <br /> 00200-1 <br />