My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' I <br /> INSTRUCTIONS TO BIDDERS <br /> 1.1 General Description and Location of Project <br /> The workperformed will includes, but isnot limited <br /> to be to, installation and maintenance of <br /> erosion control best-management-practices, removal of contaminated soil material and hauling to <br /> I an approved off-site facility, re-grading of the site, salvage and placement of borrow, demolition <br /> of existing walls, cement augmentation of the finished surface, and modifications to the <br /> abandoned Lift Station 20, and furnishing all labor, materials and equipment necessary to <br /> I perform all work as required by the contract in accordance with the Contract Plans, <br /> Specifications and Standard Specifications, all of which are made a part hereof. <br /> The project site is located within the Everett Landfill east of I-5 and west of the Snohomish <br /> IRiver, and south of 36th Street. The project site also includes the "GTS Drywall" site just north <br /> of 36th Street and east of the BNSF right of way. See Section 01060—Regulatory Requirements <br /> IIIfor description of project easements. <br /> II' 1.2 Design Engineer <br /> ineer <br /> 1 Questions and inquiries about these Specifications and Contract Plans should be directed to the <br /> attention of Tim Marks, P.E., City of Everett Project Manager at (425) 257-8872. If Tim Marks <br /> is not available, contact Mark Holmes at Perteet, Inc., at(425)252-7700. <br /> III 1.3 Standard Specifications <br /> I The following other specifications and standard plans shall apply to the extent to which they are <br /> called out in these plans and specifications. <br /> 1 1. WSDOT "2010 Standard Specifications for Road, Bridge and Municipal Construction", <br /> as amended by the APWA Supplements, hereinafter referred to as the "Standard <br /> Specifications." <br /> I 2. City of Everett"Design and Construction Standards and Specifications" <br /> (Revised 1-08). <br /> 1 3. "Standard Plans for Road and Bridge Construction,"as prepared by WSDOT. <br /> 4. "Manual on Uniform Traffic Control Devices" (MUTCD). <br /> 1 5. APWA Standards. <br /> 6. AWWA Standards. <br /> I <br /> 1.4 Filling in Proposal Forms <br /> IBidders must submit proposals on the forms found in the proposal specifications. All blank <br /> spaces in the proposal form shall be properly filled in. In addition to writing in the bid amount in <br /> I numbers, be sure and write out the bid in words in the space provided in the Proposal. Where <br /> conflict occurs, the written or typed words shall prevail. Do not qualify bids, since this will <br /> automatically be cause for rejection of the bid. <br /> I 1.5 Withdrawal of Proposal <br /> EVERETT RIVERFRONT SURCHARGE INSTRUCTIONS TO BIDDERS <br /> PHASE 3 <br /> 111 <br /> 00200-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.