Laserfiche WebLink
I <br /> At any time prior to the scheduled closing time for receipt of proposals, any bidder may withdraw I <br /> his proposal, in accordance with Section 00100, Part 5.1.6 "Withdrawal of Bids", of the <br /> Specifications. The withdrawal request shall be made personally or by written request and/or <br /> telegraphic and confirmed written request. If withdrawal is made personally,proper receipt shall <br /> be given therefore. <br /> After the scheduled closing time for the receipt of proposals, or before award of contract, no <br /> bidder will be permitted to withdraw his proposal unless said award is delayed for a period111 <br /> exceeding forty-five (45) days. Any bids received after the scheduled closing for receipt of bids <br /> shall be returned to the bidder unopened. <br /> 111 <br /> 1.6 Security to be Furnished by Each Bidder <br /> In accordance with Section 00100, Part 5.5.3 "Bid Guaranty", of the Specifications a certified <br /> check, bank cashier's check or bid bond made payable to the City of Everett for an amount equal <br /> to at least five percent (5%) of the total bid, shall accompany each proposal as evidence of good <br /> faith and as a guarantee that if awarded the contract the bidder will execute the contract and give <br /> bond as required by the Proposal. Should the successful bidder fail to enter into a contract and <br /> furnish a satisfactory performance bond within twenty (20) calendar days after the award date the <br /> certified check, cashier's check or bid bond shall be forfeited as liquidated damages. Bid <br /> deposits in cash will not be accepted. <br /> 1.7 Bidders Information <br /> The `Bidders Information Statement" supplied in the contract documents shall be filled out in <br /> detail, signed and submitted with the bid. <br /> 1.8 Execution of Contract <br /> In accordance with Section 00100, Part 10.10.3 "Acceptance of Bid", of the Specifications <br /> 111 <br /> (except as noted in Item 3 below),the bidder winning the award of this project will be required to <br /> submit the following documents to the City within twenty (20) calendar days after the award <br /> date. <br /> 1. Two (2)executed copies of the contract. <br /> 2. Contract bond or equivalent performance bond per Section 00710, Part 15.2 "Bonds", <br /> of the Specifications. <br /> 3. Certificate of Insurance and additional insured endorsement, Section 00710, Part 15.3 <br /> "Insurance", of the Specifications. <br /> 1.9 Time of Completion <br /> The Contractor shall physically complete the work within 89 calendar days from the date of <br /> written notice to proceed in accordance with Section 1-08.5 of the Specifications. All <br /> preload/surcharge work shall be completed as outlined in Section 01313. <br /> 1.10 Wage Rates <br /> The prevailing rate of wages to be paid all workmen, laborers or mechanics employed in the <br /> performance of any part of this contract shall be in accordance with Section 00710, Part 7.1 <br /> EVERETT RIVERFRONT SURCHARGE INSTRUCTIONS TO BIDDERS 1 <br /> PHASE 3 WO No. RD 3316-32 <br /> 00200-2 <br />