My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Deviation from the Standard Plans must be submitted by the Contractor and approved by <br /> the City prior to construction. <br /> 12. Disposal Sites: Provide the Engineer with the location of all disposal sites to be used, <br /> and also provide copies of the permits and approvals for such disposal sites. The <br /> Contractor shall provide the Engineer with copies of all permits for disposal and/or <br /> storage of surplus materials within ten(10)calendar days after award of the contract. <br /> 1 <br /> End of Section <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> EVERETT RIVERFRONT SURCHARGE INSTRUCTIONS TO BIDDERS <br /> PHASE 3 WO No. RD 3316-32 <br /> 00200-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.