My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> DIVISION 02 1 <br /> 02 41 00—SITE DEMOLITION AND SALVAGE <br /> 02 61 13— EXCAVATION AND DISPOSAL OF CONTAMINATED SOIL <br /> 02 65 00— UNDERGROUND STORAGE TANK REMOVAL AND CLOSURE <br /> 02 71 00—CONTAMINATED DEWATERING DISCHARGE <br /> DIVISION 31 1 <br /> 31 09 01 — SETTLEMENT PLATES <br /> 31 09 02 —SONDEX AND VWP SETTLEMENT MONITORING STATIONS <br /> 31 09 09- PROTECTION/DECOMMISSIONING OF EXISTING MONITORING WELLS AND <br /> GAS PROBES <br /> 31 10 00—CLEARING AND GRUBBING <br /> 31 11 00— DISKING EXISTING VEGETATION <br /> 31 23 33—TRENCHING AND BACKFILLING <br /> 31 24 01 — EXCAVATION AND EMBANKMENT CONSTRUCTION <br /> 31 25 00 —TEMPORARY EROSION AND SEDIMENTATION CONTROL <br /> 31 32 13.16—CEMENT MODIFIED SOIL MATERIALS (CMSM) <br /> 31 32 22 —GEOMEMBRANES <br /> 31 41 00—SHEETING, SHORING, BRACING, AND SLOPING <br /> 31 80 00— REINFORCED EDGE WALL <br /> DIVISION 32 <br /> 32 31 13 —CHAIN LINK FENCE <br /> 32 92 13— HYDROSEEDING <br /> DIVISION 33 N <br /> 33 31 16— HDPE PIPE AND FITTINGS <br /> 33 31 18 — LEACHATE COLLECTION AND CONVEYANCE SYSTEM <br /> APPENDICES <br /> Appendix A— Not Used <br /> Appendix B—Gravel Borrow and Topsoil Locations <br /> Appendix C —Report—Geotechnical Engineering Services— Surcharge Evaluation — Landfill <br /> Site, prepared by GeoEngineers, Inc. <br /> Appendix D—GTS Site Boring Logs <br /> Appendix E— Puget Sound Clean Air Agency — Excerpts of Air Quality Rules <br /> Appendix F—Change Order Forms <br /> Appendix G —GTS Site Analytical Results Tables <br /> Appendix H —Table 6-1 Remedial Actions for Development Components (Cleanup Action Plan: <br /> Everett Landfill Tire Fire Site— Final March 2001) <br /> Appendix I — Not used <br /> Appendix J - Remedial Investigation/Feasibility Study/Cleanup Action Plan, Former GTS Drywall111 <br /> Site, Everett, WA <br /> Appendix K— Discharge Authorization <br /> Appendix L— Site A2 Priority Area <br /> Appendix M —Geotechnical Data Report, Cement Modification of Existing Subgrade Soils, <br /> Phase III Main Surcharge Area, Everett Riverfront Development, Everett, WA, <br /> prepared by HWA GeoSciences, April 9, 2010 <br /> Appendix N —Clearing and Grubbing Figure <br /> EVERETT RIVERFRONT SURCHARGE Table of Contents <br /> PHASE 3 <br /> Page 2 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.