My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I5.6. Possession of Incomplete Portions of the Project 19 <br /> 5.7. Substantial Completion 19 <br /> I5.8. Acceptance of Work 20 <br /> I6. CHANGES 20 <br /> 6.1 Owner's Right to Direct Changes to the Work 20 <br /> I6.2 Extra Work 20 <br /> 6.3 Change Orders 20 <br /> S6.4 Value Engineering and Cost Sharing 21 <br /> I7. LABOR STANDARDS 21 <br /> 7.1. Wages of Employees 21 <br /> I7.1.1. General 21 <br /> 7.1.2. Contractor's Responsibility 22 <br /> 1 7.1.3. Federal Labor Requirements 22 <br /> 7.2. Payment Certificates 22 <br /> 1 7.3. Hours of Labor 22 <br /> 7.4. Contract Work Hours 22 <br /> I7.5. Overtime Work 22 <br /> I7.6 Labor Relations 23 <br /> 8. MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION UTILITIES23 <br /> I8.1. General 23 <br /> 8.2. Product Data 23 <br /> I8.3. Quality 24 <br /> 8.4. Material and Equipment Specified by Name—"Or-Equals"And Substitutes 24 <br /> 8.6. Demonstration of Compliance with Contract Requirements 26 <br /> 8.6.1. Inspection 26 <br /> I8.6.2. Samples of Materials 26 <br /> I 8.6.3. Certification 26 <br /> 8.6.4. Inspection at Point of Manufacturing 27 <br /> IIEVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-iii <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.