Laserfiche WebLink
I <br /> I5.6. Possession of Incomplete Portions of the Project 19 <br /> 5.7. Substantial Completion 19 <br /> I5.8. Acceptance of Work 20 <br /> I6. CHANGES 20 <br /> 6.1 Owner's Right to Direct Changes to the Work 20 <br /> I6.2 Extra Work 20 <br /> 6.3 Change Orders 20 <br /> S6.4 Value Engineering and Cost Sharing 21 <br /> I7. LABOR STANDARDS 21 <br /> 7.1. Wages of Employees 21 <br /> I7.1.1. General 21 <br /> 7.1.2. Contractor's Responsibility 22 <br /> 1 7.1.3. Federal Labor Requirements 22 <br /> 7.2. Payment Certificates 22 <br /> 1 7.3. Hours of Labor 22 <br /> 7.4. Contract Work Hours 22 <br /> I7.5. Overtime Work 22 <br /> I7.6 Labor Relations 23 <br /> 8. MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION UTILITIES23 <br /> I8.1. General 23 <br /> 8.2. Product Data 23 <br /> I8.3. Quality 24 <br /> 8.4. Material and Equipment Specified by Name—"Or-Equals"And Substitutes 24 <br /> 8.6. Demonstration of Compliance with Contract Requirements 26 <br /> 8.6.1. Inspection 26 <br /> I8.6.2. Samples of Materials 26 <br /> I 8.6.3. Certification 26 <br /> 8.6.4. Inspection at Point of Manufacturing 27 <br /> IIEVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-iii <br /> 1 <br />