Laserfiche WebLink
I <br /> 8.6.5. Testing and Commissioning of Completed Work 27 I <br /> 8.6.6. Storage of Materials and Equipment 27 <br /> 8.6.7. Manufacturer's Directions 27 I <br /> 8.7. Defective Work 27 <br /> 8.7.1. Correction of Defective Work 27 <br /> 8.7.2. Retention of Defective Work 28 <br /> 8.8. Materials and Equipment Furnished by Owner 28 <br /> 8.9. Guarantee 28 <br /> 9. MEASUREMENT AND PAYMENT 29 <br /> 9.1. Payments to Contractor 29 I <br /> 9.1.1. Schedule of Values 29 <br /> 9.1.2. Progress Payments 30 <br /> 9.1.3. Final Payment 31 <br /> I <br /> 9.2. Payment for Changes 32 <br /> 9.2.1. Changes in Estimated Quantities of Unit Price Work 32 <br /> 9.2.2. Changes in Work Not Covered By Unit Prices 32 <br /> 9.2.3. Deleted Work 32 <br /> 9.3. Charges to Contractor 33 <br /> 9.4. Compensation to Owner for Time Extension 34 <br /> 9.5. Adjustment of Contract Sum 34 <br /> 9.5.1 Calculation 34 <br /> 9.5.2 Limitations 34 <br /> 9.5.3 Unabsorbed and Extended Overhead 35 1 <br /> 9.6. Force Account 35 <br /> 9.6.1 Labor. 36 1 <br /> 9.6.2. Materials. 36 <br /> 9.6.3. Equipment 37 <br /> 9.7. Retainage 39 <br /> 1 <br /> EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS 1 <br /> PHASE 3 <br /> 00710-iv <br /> 1 <br />