Laserfiche WebLink
2.3.2. Conflicting Provisions <br /> Figure dimensions on drawings shall govern over scale dimensions and detail drawings shall govern over <br /> general drawings. In the event an item of Work is described differently in two or more locations on the <br /> drawings and in the Specifications, the Contractor shall, upon request of the Owner's Representative, <br /> submit in writing to the Owner's Representative the description upon which the Contractor relied in <br /> preparing its bid or laying out the Work. If the Owner's Representative directs the Contractor to perform <br /> Work in a manner other than that contemplated by the Contractor in preparing its bid or laying out the <br /> 111 <br /> Work, Change Order procedures will be followed. In this event, the Contractor shall submit to the <br /> Owner's Representative such supporting information, including bidding or layout documents, as may <br /> reasonably be necessary for the Owner's Representative to determine whether the Contract Sum is <br /> increased, decreased or unchanged by the Change Order. <br /> 2.3.3. Utilities <br /> 2.3.3.1 General <br /> The Owner has endeavored to determine the existence of utilities at the site of the Work from the records <br /> of the Owners of known utilities in the vicinity of the Work. The positions of these utilities as derived from <br /> such records are shown on the drawings. No excavations were made to verify the locations shown for <br /> underground utilities. The service connections to these utilities are not shown on the drawings. It shall <br /> be the responsibility of the Contractor to determine the exact location of utilities and service connections <br /> thereto. Such field verification must be performed in sufficient time so as not to impede the progress of <br /> the Work or fabrication of materials to be incorporated into the Work. The Contractor shall call the Utility <br /> Location Request Center(one call center)for location of utilities in the field not less than two(2) nor more <br /> than (10)ten business days before the scheduled date of commencement of excavation. The Contractor <br /> shall make its own investigations, including exploratory excavations, to determine the locations and type <br /> of existing utilities, including service connections, prior to commencing work that could result in damage <br /> to such utilities. The Contractor shall immediately notify the Owner's Representative as to any utility <br /> discovered by him in a different position than shown on the drawings or which is not shown on the <br /> drawings. No excavation shall begin until all known facilities in the excavation areas have been marked. <br /> Contractor shall coordinate its activities with the utility provider. Contractor shall bear the cost of <br /> maintaining utility service. <br /> The Contractor should be aware of, and comply with, Chapter 19.122 RCW, a law relating to underground <br /> utilities. The Owner shall not pay Contractor any of Contractor's cost of complying with this law, and <br /> repairing or indemnifying any damage or injury arising out of Contractor's failure to comply with this law. <br /> Owner does not represent or warrant who may be obligated to pay for the cost of relocation or temporary <br /> maintenance of the utility. Contractor shall investigate whether such cost must be borne by the owner of <br /> the utility. <br /> Governmental agencies and owners of utilities reserve the right to enter upon streets, alleys, rights-of- <br /> way, or easements for the purpose of making changes in their property made necessary by the Work and <br /> for the purpose of maintaining and making repairs to their property. <br /> 2.3.3.2 Known Utilities <br /> 111 <br /> The Contractor shall provide at its sole expense all labor, Equipment, materials and services necessary to <br /> remove, relocate, or maintain utilities specified on the drawings. The work on each utility shall be <br /> performed in a manner satisfactory to the utility owner. The utility owner has the option of doing such <br /> work with its own forces at the Contractor's expense, or permitting the work to be performed by the <br /> Contractor. <br /> 2.3.3.3 Service Connections <br /> Locations of service connections are not identified on the drawings. The Contractor shall provide at its <br /> sole expense all labor, Equipment and material to remove, relocate or maintain service connections. <br /> Work on service connections shall be performed in a manner satisfactory to the service connection <br /> owner. The service connection owner has the option of doing such work with its own force at the <br /> Contractor's expense, or permitting the work to be performed by the Contractor. <br /> EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS ! <br /> PHASE 3 <br /> 00710-6 <br />