Laserfiche WebLink
depending on the format of the section. The Contractor shall not take advantage of any variation of form, <br /> format or style in making claims for extra Work. <br /> The cross referencing of specification sections under the subparagraph heading "Related Sections <br /> include but are not necessarily limited to:"and elsewhere within each specification section is provided as <br /> an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing <br /> provided and shall be responsible to coordinate the entire Work under the Contract Documents and <br /> provide a complete Project whether or not the cross referencing is provided in each section or whether or <br /> not the cross referencing is complete. <br /> Whenever an item of material or equipment is specified or described in the Contract Documents by using <br /> the name of a proprietary item or the name of a particular Supplier, the specification or description is <br /> intended to establish the type, function, appearance, and quality required. Unless the specification or <br /> description contains or is followed by words reading that no like, equivalent, or"or-equal" item or no <br /> substitution is permitted, other items of material or equipment or material or equipment of other Suppliers <br /> may be submitted to Engineer for review under the circumstances described below. <br /> Reference to standards, specifications, manuals, or codes of any technical society, organization, or <br /> association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean <br /> the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids <br /> (or on the Effective Date of the Agreement if there w^re no Bids), except as may be otherwise specifically <br /> stated in the Contract Documents. <br /> No provision of any such standard, specification, manual or code, or any instruction of a Supplier shall be <br /> effective to change the duties or responsibilities of Owner, Contractor, or Engineer, or any of their <br /> subcontractors, consultants, agents, or employees from those set forth in the Contract Documents. No <br /> such provision or instruction shall be effective to assign to Owner, or Engineer, or any of, their Related <br /> Entities, any duty or authority to supervise or direct the performance of the Work or any duty or authority <br /> to undertake responsibility inconsistent with the provisions of the Contract Documents. <br /> 2.2. DIVISION OF SPECIFICATIONS AND DRAWINGS <br /> Specifications and drawings are divided into groups for convenience. These divisions are not for the <br /> purpose of apportioning Work or responsibility for Work among subcontractors, suppliers and <br /> manufacturers. The Contractor is responsible for all Work shown or described, regardless of location(s) <br /> in the Contract Documents. <br /> 2.3. DISCREPANCIES IN SPECIFICATIONS AND DRAWINGS <br /> 2.3.1. Errors and Omissions <br /> If the Contractor, in the course of the Work, becomes aware of any errors or omissions in the Contract <br /> Documents or in the Owner's field work, he or she shall immediately inform the Owner's Representative in <br /> writing. The Owner's Representative will promptly review the matter and if he or she finds an error or <br /> omission has been made, he or she will determine the corrective actions and advise the Contractor <br /> accordingly. If the corrective work associated with an error or omission significantly increases or <br /> decreases the amount of work called for in the Contract, the Owner will issue an appropriate Change <br /> Order. After discovery by the Contractor of an error or omission, related work performed by the <br /> Contractor shall be done at its risk unless authorized by the Owner's Representative and approved by the <br /> Owner. Omissions from the drawings or specifications or the misdescription of details of work which are <br /> manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily <br /> performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the <br /> work, but they shall be performed as if fully and correctly set forth and described in the drawings and <br /> specifications. <br /> I <br /> ' EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-5 <br />