My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> b. Possession of mace, pepper spray or the like for defensive purposes is not a violation of this policy. <br /> Contractor shall remove from the job site any person reasonably under its control or direction who the <br /> Contractor or Owner reasonably believes violated this section. The lack of a request from the Owner or <br /> Owner's Representative to the Contractor to remove someone from the job site does not relieve the <br /> Contractor from its obligation to remove someone. <br /> 4.4.8. Safety Standards <br /> The Contractor shall comply with Section 107 of the Contract Work Hours and Safety Standards Act(40 1 <br /> U.S.C. 327-330)as supplemented by Department of Labor Regulations(29 CFR, Part 5). Under this <br /> Section, the Contractor shall not require any laborer or mechanic to work in surroundings or under <br /> working conditions that are unsanitary, hazardous, or dangerous to its health and safety as determined <br /> under construction, safety, and health standards promulgated by the Secretary of Labor. These <br /> requirements do not apply to the purchase of supplies or materials or articles ordinarily available on the <br /> open market, or contracts for transportation or transmission of intelligence. <br /> 4.4.9. Public Safety and Convenience <br /> The Contractor shall conduct its work so as to ensure the least possible obstruction to traffic and <br /> inconvenience to the general public, business, organizations and residents in the vicinity of the work and <br /> to reasonably protect persons and property. No roads or street shall be closed to the public except with <br /> the permission of the Owner's Representative and the proper governmental authority. Fire hydrants on or <br /> adjacent to the work shall be accessible to fire fighting Equipment. Temporary provisions shall be made <br /> by the Contractor for the use of sidewalks, private and public driveways and proper functioning of gutters, <br /> sewer inlets, drainage ditches and culverts, irrigation ditches and natural water courses. <br /> 4.4.10 ACCESS To WORK <br /> Owner, Owner's Representative, Engineer, their consultants and other representatives and personnel of <br /> Owner, independent testing laboratories, and governmental agencies with jurisdictional interests will have <br /> access to the Site and the Work at reasonable times for their observation, inspecting, and testing. <br /> Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's <br /> Site safety procedures and programs so that they may comply therewith as applicable. <br /> 4.4.11 EMERGENCIES <br /> In emergencies affecting the safety or protection of persons or the Work or property at the Site or <br /> adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor <br /> shall give Owner's Representative prompt written notice if Contractor believes that any significant <br /> changes in the Work or variations from the Contract Documents have been caused thereby or are <br /> required as a result thereof. If Owner's Representative determines that a change in the Contract <br /> Documents is required because of the action taken by Contractor in response to such an emergency, a <br /> Work Change Directive or Change Order will be issued. <br /> 4.5. OWNER-CONTRACTOR COORDINATION 1 <br /> 4.5.1. Service of Notice <br /> Contractor agrees that any Notice, order, direction, request or other communication by the Owner's <br /> Representative or Owner to the Contractor shall be deemed received by the Contractor if left at any office <br /> used by the Contractor or delivered to any of the Contractor's officers, clerks or employees or posted at <br /> the site of the work or mailed to any post office addressed to the Contractor at the address given in the <br /> Contract Documents or mailed to the Contractor's last known place of business. If mailed, any form of <br /> communication will be deemed to have been given to and received by the Contractor the day after the <br /> day of mailing. <br /> EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS , <br /> PHASE 3 <br /> 00710-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.