My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 4.5.2. Suggestions to Contractor <br /> Nothing in these Contract Documents requires the Engineer or Owner's Representative to provide the <br /> I Contractor with direction or advice on how to do the work, construction practices, or means and methods. <br /> If the Engineer or Owner's Representative approves, suggests or recommends any construction practice, <br /> means, method or manner for doing the work or producing materials, the approval or recommendation <br /> shall not: (A)guarantee that following the method or manner will result in compliance with the Contract <br /> I Documents; (B) relieve the Contractor of any risks or obligations under the Contract Documents; or(C) <br /> create any liability by the Owner to the Contractor. <br /> Suggestions as to the plans or methods of accomplishing the work or Contract requirements by the <br /> I Owner, Engineer or the Owner's Representative to the Contractor but not specified or required, if adopted <br /> or followed by the Contractor in whole or in part, shall be used at the risk and responsibility of the <br /> Contractor. The Owner, Engineer and the Owner's Representative assume no responsibility therefor and <br /> I in no way will be held liable for any defects in the work which may result from or be caused by use of <br /> such plan or method or work. <br /> 4.5.3 Meetings with Owner <br /> I The Contractor shall have its duly authorized representative attend periodic informational meetings with <br /> the Owner's Representative and City staff, as reasonably required by the Owner. <br /> Contractor, Owner, and Owner's Representative shall meet as often as determined by the Owner's <br /> I Representative, but no less often than once each month. The purpose of the meeting is to review Project <br /> status in relation to the construction schedule; review value of work completed during the previous month; <br /> and, if applicable, review Contractor's plans to return Project status to that required by the schedule. If <br /> I requested by the Owner or Owner's Representative, the Contractor shall submit a written progress report <br /> within five (5)days following this meeting, comprising: <br /> 1. The current construction schedule indicating percent complete, actual completion or start <br /> dates since the previous review, the estimated remaining duration for each activity in <br /> Iprogress, Schedule of Values update, and narrative summary. <br /> 2. Reasons any activities are behind schedule and the corrective steps being taken. <br /> 4.5.4. Cooperation with Others <br /> The Contractor agrees to permit entry to the site of the work by the Owner, its employees or other <br /> contractors performing work on behalf of the Owner. The Contractor shall afford to the Owner, other <br /> contractors and their employees, reasonable facilities and cooperation and shall arrange its work and <br /> dispose of its materials in such a manner as to not interfere with the activities of the Owner or of others <br /> upon the site of work. The Contractor shall promptly make good any Contractor-caused injury or damage <br /> to persons or property that may be sustained by other contractors or employees of the Owner. The <br /> I Contractor shall join its work to that of others and perform its work in proper sequence in relation to that of <br /> others. <br /> If requested by the Contractor, the Owner will arrange meetings with other contractors performing work on <br /> I behalf of the Owner to plan coordination of construction activities. The Contractor shall inform itself of the <br /> planned activities of other contractors and will coordinate its work with the other contractors. <br /> Contractor shall notify the Owner of problems, interference or any difficulty with other contractors or <br /> I workers engaged by the Owner. The Notice shall be sufficiently prompt and specific so as to allow the <br /> Owner to mitigate or avoid increased costs, time of performance, damages or injury. Contractor's failure <br /> to provide such Notice in a timely way shall be deemed a waiver and release of any and all Contract <br /> I Claims relating to, arising out of, or caused by, any alleged interference, difficulty or problem with another <br /> contractor or worker engaged by the Owner. <br /> 1 <br /> IEVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.