i <br /> E. Engineer's Cost Reimbursement: Engineer will record Engineer's costs in evaluating a , <br /> substitute proposed or submitted by Contractor pursuant to Paragraphs 8.4.A.2. and <br /> 8.4.B.Whether or not Engineer approves a substitute item so proposed or submitted by <br /> Contractor, Contractor shall reimburse Owner for the charges of Engineer for evaluating <br /> each such proposed substitute. Contractor shall also reimburse Owner for the charges of <br /> Engineer for making changes in the Contract Documents (or in the provisions of any <br /> other direct contract with Owner) resulting from the acceptance of each proposed <br /> substitute. <br /> F. Contractor's Expense: Contractor shall provide all data in support of any proposed <br /> substitute or"or-equal" at Contractor's expense. <br /> G. See Specification Section 01600. <br /> 8.5. NOT USED , <br /> 8.6. DEMONSTRATION OF COMPLIANCE WITH CONTRACT REQUIREMENTS <br /> 8.6.1. Inspection ' <br /> The burden of proving the constructed work complies with the Contract Documents shall be on the <br /> Contractor at all times. To demonstrate its compliance with the Contract requirements, the Contractor <br /> shall assist the Owner's Representative in his or her inspection and observation of the work. The111 <br /> Contractor shall grant the Owner's Representative access to the work and work site, and to places where <br /> work is being prepared, or where materials, Equipment, or machinery are being obtained for work. The <br /> Contractor shall provide information requested by the Owner's Representative in connection with <br /> inspection work. <br /> If the Contract Documents, laws, ordinances, or any public regulatory authority require parts of the work <br /> to be specially inspected, tested, or approved, the Contractor shall give the Owner's Representative <br /> adequate prior written Notice of the availability of the subject work for examination, which Notice shall be <br /> not less than two (2) working days. <br /> Inspection and quality control tests performed on work by the Contractor by the Owner's Representative <br /> shall not relieve the Contractor of its responsibility for errors or lack of quality therein and shall not be <br /> regarded as an assumption of risks or liability by the Owner's Representative for the Contractor's <br /> compliance with these Contract Documents. Contractor remains responsible and liable for any and all <br /> errors, defects or a lack of quality not discovered by inspection or observation. <br /> If parts of the work are covered prior to inspection or observation, the cost of exposing the work for <br /> inspection and closing and re-covering shall be borne by the Contractor regardless of whether the work is <br /> found to be in compliance with the Contract. , <br /> 8.6.2. Samples of Materials <br /> The Contractor shall provide samples or specimens of materials to be incorporated in the work that <br /> require laboratory examination or special testing, as requested by the Owner's Representative. Such <br /> samples or specimens shall be provided in ample time to permit making proper test analysis and <br /> examinations before the Contractor plans to incorporate the material into the work. An independent <br /> testing laboratory will conduct tests of material in accordance with the Specifications. In the absence of a <br /> specific test requirement, the Owner's Representative will determine the appropriate standard test to be <br /> used. <br /> 8.6.3. Certification I <br /> In cases where compliance of materials or Equipment to Contract requirements is not readily <br /> determinable through inspection and tests, the Contractor shall provide properly authenticated <br /> documents, certificates, or other proof satisfactory to the Owner's Representative that the materials and <br /> Equipment comply with the Contract requirements. These documents, certifications, and proofs shall <br /> EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-26 <br /> I <br />