I <br /> I include performance characteristics, construction materials, and physical or chemical characteristics of <br /> materials. The Contractor shall pay all associated costs of such certification. <br /> I 8.6.4. Inspection at Point of Manufacturing <br /> If(a) inspection and testing of materials or Equipment in the vicinity of the Work by the Owner is not <br /> practicable, (b) the Contractor requests the Owner to inspect and test material or Equipment at the point <br /> I of manufacture, or(c)the specifications require that inspection, testing or witnessing of tests take place at <br /> the point of manufacture, the Contractor shall be responsible and reimburse the Owner for the costs of <br /> inspections, if inspections occur outside of Whatcom, Skagit, Island, Snohomish, King, Pierce and <br /> Thurston counties. Costs to be paid or reimbursed by the Contractor include, but are not limited to, travel, <br /> I subsistence, labor and lodging expenses of the City's inspector. <br /> 8.6.5. Testing and Commissioning of Completed Work <br /> Testing and commissioning of all mechanical, electrical, and instrumentation systems and completed <br /> I <br /> portions of the work, functioning as a completed system and the complete Project, functioning as a <br /> completed facility, shall be done in accordance with the specifications. <br /> I 8.6.6. Storage of Materials and Equipment <br /> Contractor shall store materials and Equipment so as to insure the preservation of their quality and fitness <br /> for the work. Stored Equipment and materials shall be located so as to facilitate inspection. The <br /> Contractor shall be responsible for damages, loss or casualty occurring to materials and Equipment until <br /> Final Acceptance. <br /> 8.6.7. Manufacturer's Directions <br /> I Manufactured articles, material and Equipment shall be transported, stored, applied, installed, connected, <br /> erected, adjusted, tested, operated and maintained as recommended by the manufacturer, unless <br /> otherwise specified herein. Manufacturer's installation instructions and procedures shall be provided to <br /> the Owner prior to installation of the manufactured articles, material and Equipment. <br /> I8.7. DEFECTIVE WORK <br /> 8.7.1. Correction of Defective Work <br /> IWhen, and as often as the Owner's Representative determines through his or her inspection procedures, <br /> material, Equipment or workmanship incorporated in the Project do not meet the requirements of the <br /> Contract, the Owner's Representative will give written Notice of the noncompliance to the Contractor. <br /> I Within fourteen (14)days from the receipt of such Notice, the Contractor shall undertake the work <br /> necessary to correct the deficiencies, and to comply with the Contract. If the Contractor disagrees with <br /> the Owner's Representative's determination and believes that the corrective work should be covered by a <br /> I Change Order, he or she shall immediately notify the Owner, in writing, setting forth its position. Within <br /> five (5)days after receipt of the Contractor's notification, the Owner will review the matter and notify the <br /> Contractor, in writing, of his or her determination. <br /> I If the Owner determines that the corrective work is required to comply with the Contract, the Contractor <br /> shall proceed with such work. As a condition precedent to the Contractor's request for adjustment of <br /> Contract Sum, Contract Time, or both, resulting from the performance of such corrective work, the <br /> Contractor shall, within fifteen (15) days after receipt of the Owner's determination, provide the Owner <br /> I with Notice of a Contract Claim for an adjustment of Contract Sum, Contract Time, or both. Contract <br /> Claims not timely and completely submitted are deemed waived. The Contractor shall document the cost <br /> information associated with the corrective work with daily records in accordance with Force Account <br /> 1 procedures and shall provide such information to the Owner's Representative daily. Receipt of the cost <br /> data by the Owner's Representative will not be construed to be an acceptance of the corrective work, or <br /> an authorization for a Change Order to cover the corrective work. Contractor waives any such Contract <br /> Claim by failing to maintain accurate and complete Force Account records. <br /> I <br /> IEVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-27 <br />