Laserfiche WebLink
I <br /> I2. correct such defective Work; or <br /> 3. if the defective Work has been rejected by Owner, remove it from the Project and <br /> I replace it with Work that is not defective, and <br /> 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the <br /> work of others or other land or areas resulting there from. <br /> I B. If Contractor does not promptly comply with the terms of Owner's written instructions, or <br /> in an emergency where delay would cause serious risk of loss or damage, Owner may <br /> have the defective Work corrected or repaired or may have the rejected Work removed <br /> I and replaced. All claims, costs, losses, and damages(including but not limited to all fees <br /> and charges of engineers, architects, attorneys, and other professionals and all court or <br /> arbitration or other dispute resolution costs)arising out of or relating to such correction or <br /> repair or such removal and replacement(including but not limited to all costs of repair or <br /> replacement of work of others)will be paid by Contractor. <br /> I The Owner is hereby authorized to make such repairs if, ten (10)days after giving of <br /> such Notice to the Contractor, the Contractor has failed to make or undertake the repairs <br /> I with due diligence. In case of an emergency where, in the opinion of the Owner, delay <br /> could cause serious loss or damage repairs may be made prior to or concurrent with <br /> Notice being sent to the Contractor. All expenses in connection with such repairs will be <br /> I C. charged to the Contractor. <br /> In special circumstances where a particular item of equipment is placed in continuous <br /> service before Substantial Completion of all the Work,the correction period for that item <br /> I <br /> may start to run from an earlier date if so provided in the Specifications . <br /> D. Where defective Work(and damage to other Work resulting therefrom) has been <br /> corrected or removed and replaced under this Paragraph 8.7, the correction period <br /> I hereunder with respect to such Work will be extended for an additional period of one year <br /> after such correction or removal and replacement has been satisfactorily completed. <br /> E. Contractor's obligations under this Paragraph 8.10 are in addition to any other obligation <br /> I or warranty. The provisions of this Paragraph 8.10 shall not be construed as a substitute <br /> for or a waiver of the provisions of any applicable statute of limitation or repose. <br /> I9. MEASUREMENT AND PAYMENT <br /> 9.1. PAYMENTS TO CONTRACTOR <br /> 1 9.1.1. Schedule of Values <br /> The Contractor shall submit a Schedule of Values at least fifteen (15)days prior to submitting its first <br /> I Application for Payment. If the project contains Unit Price Work, in whole or in part, then the Schedule of <br /> Values for that portion of the Work shall also be based on unit prices. If the bid form calls for a lump sum <br /> price, in whole or in part, then the Schedule of Values shall: reasonably allocate the Contract Sum among <br /> the various portions of the Work; be complete; be organized to include detailed breakdown of each major <br /> I <br /> unit of the work; be organized to correspond to Contractor's schedule; break down the Contract Sum <br /> showing the value assigned to each part of the work; include an allowance for profit and overhead; <br /> include unit price work, if and to the extent indicated on the bid form; be so organized as to facilitate <br /> I assessment of work and payment of subcontractors; and be balanced. To the greatest extent possible, <br /> the breakdown shall use the same tasks/units as the Contractor's schedule. Contractor shall provide <br /> documentation substantiating the cost allocation if asked by the Owner's Representative. Upon <br /> acceptance of the Schedule of Values by the Owner's Representative, it shall be used as a basis for all <br /> Irequests for payment. <br /> IEVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-29 <br />