My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3703 RAILWAY AVE KIMBERLY CLARK 2018-01-01 MF Import
>
Address Records
>
RAILWAY AVE
>
3703
>
KIMBERLY CLARK
>
3703 RAILWAY AVE KIMBERLY CLARK 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 7:45:11 AM
Creation date
2/13/2019 7:41:51 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
3703
Tenant Name
KIMBERLY CLARK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K��erly-Clark Corporaiion Jacobs �ngineering <br />Project Engineering Team <br />Project: Riverside Waste Wood Handling <br />ADD�NDUM 'a TO PROJECT SPECIPICATION 5-28-oz <br />1'he followin� chan�es are rec�iired Uv the City of Everett <br />i. rlttached is a copy of the City of Everett "Design and Construction Standards <br />and Specifications" for �vater distribution. Fire and sen�ice water pip�ng is to <br />be constructed in accordance with the app:icable sections of this spec. <br />2. Regarding Section II Scope of �Nork, para B Piping, please note the changes <br />on the attached drawings. (Please discard the original drawings and use <br />these latest). <br />l�ir•e Protection Systerri <br />a. Iiydrant #i is to Ue located approx 6o fcet cast of thc southeast corner of <br />the asphalt pad. <br />b. Piping from the existing hydrant to the new #i fire hydrant is to be iz", <br />same as piping to Nie existing h}�drant. (Piping to #2 and #3 hydrant is <br />still 8"). <br />c. Contractor to rw� the ne�v piping, but the piping connection to the existing <br />hydrant for piping to the new # i hydrant will Ue made by City crews. <br />Ser•uice Wnter <br />d. The sei��ce water is to Ue supplied from a connection ro Hydrant #2, not <br />#i. Kun the i-i/2" line imder the new pad Uefore pa��ng. <br />e. Add another service water hydrant at the west edge of the pad. Protect this <br />liydrant ���th a square of ecolog}� Ulocks. <br />f. �ach of the sen�ce water hydrants is to Uc equipped ��rith a back flow <br />prevention de��ce in the i-i/2" line. <br />3. All ne��� piping is to Ue disinfected prior to being put in sei��ce. Blank the ends <br />of the lines �vhere they connect to the City se���ce and fil] ���th water containing <br />chlorine bleach according to il�e section on page �4 of the City specs. L.eave <br />overnight aml flusli �vell the next day by connecting to the Cih� sen�ce and <br />running �vater thru the new lines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.