My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3703 RAILWAY AVE KIMBERLY CLARK 2018-01-01 MF Import
>
Address Records
>
RAILWAY AVE
>
3703
>
KIMBERLY CLARK
>
3703 RAILWAY AVE KIMBERLY CLARK 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 7:45:11 AM
Creation date
2/13/2019 7:41:51 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
3703
Tenant Name
KIMBERLY CLARK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� OS/29/02 10:19 FA� � OOi <br />. WATET2 AISTRIBUTION <br />b) Unimproved areas or landscape azeas shall be compacted to 90% of maximum dty density. <br />� iee Section 3-9 for additi�nal requirements on compacrion. <br />5-8 CONSTRUC7'ION T2�QLTIREMENTS <br />5-8,1. DENATERIPiG OF TRENCH <br />Where water is encounte:red in the trench, it shall be removed during pipe-laying operations and the <br />ucnch so maintained until the ends of the pipe are sealed and provisions aze made w preven[ floating of <br />che pipe. Trench water o r other delecerious materials shall not be allowed to enter the pipe at any time. <br />5-S.Z HANDLING UF PIPE <br />All types of pipe shall tie l�andled in a n�.wner that will prevent damage to the pipe, pipe linir.a or <br />coaung. Pipe and fittings shall be loaded and unloaded using hoisu and slings in a manner to avoid shock <br />or damage, and under no circumstances shall they be dropped, skidded, or rolled agairs: other pipe. <br />Damaged pipe will be reiectcd, and the contractor shall immediately place all damaged p�pe apart from <br />the :mdamaged and shall �'emove tbe damaged pipe from the site within 24 hours. <br />Methods of Landling shall be cozrected by the contractor if the engineer determines that these methods are <br />damaging ro the nipe. <br />All pipe [o be purchas:�.: und .^.stailea as a patt of the Ciry of Everett water system shall be delivered to <br />the job site or ciry yaz�i w1u, �Nater tight pipe plugs. Furthermore, to comply with City of Everett Design <br />and Consffuction Standards and AV✓WA Standards, thhese pipe plugs shall remain in place until the pipe is <br />ivstalled in the Vench at which time onr end plug would be removed for joining pipe ends. <br />If [here is any pipe not uieeting this requuement, the Ciry shall reject it, or under special cucun�stances <br />may allow that it be swabSed out with clilorine solution and capped before acceptance by the City. <br />llirt or other foreign mat?rial shall be prevented from entering the pipe or pipe joint during handling or <br />laying operations, and an�� pipe or fitting that has been installed with dut or foreign material ia it shall be <br />removed, cleancd, and refayed. A clean whisk broom shall be used for this purpose and for brushing to <br />remove foreign matter prior to joining of pipe ends. At tunes when pipe laying is not in progress, the <br />open ends of the pipe shal Be closed by a watertight plug or by other meaas approved.by the .engineer to <br />cnsure c:eanliness inside the pipe. <br />Pipe sball be stacked in sich a manner as to prevent damage to the pipe, to prevent dirt and debris from <br />entering the gipe, and to prevent any movement o# tbe pipe. The bottom riers of [he stack shall be kept <br />off tbe ground on timbers, rails or other similaz supports. Pipe on succeeding [iers shall be alternated by � <br />bell and plain end. Tinbrrs 4 inches by 4 inches in sue shall be placed between tiers and chocks shall be <br />placed at each end to prevent movement. For safety ea�h size of pipe shall be stacked separately. <br />5-8.3 CUTl'ING PII']'s <br />Whenever it becomes necessary to cut a length of pipe, the cut shall be made by abrasive saw or by a <br />special pipe cutter. All F�ipe ends sLall be square with the longitudinal axis of the pipe and the ouuide <br />shall be bevelled and oth�;rwise smoothed so that good connections can be made without damage to the <br />gasket. Threads sball be �:leanly cut. Oxyacerylene torch cutruig of ducdle izon pipe will not be alloaed. <br />STANDAROS 5-7 , <br />. - � � Rw.10l00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.