My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/01/30 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/01/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 9:33:00 AM
Creation date
2/14/2019 9:32:25 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/30/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b <br /> Project: Wetmore Avenue Stormwater Bypass Project <br /> Change Order No.3 <br /> Change Order Effective Date: January 14,2019 <br /> CONTRACTOR <br /> By6,12A <br /> Date: 1115 ill <br /> Officer <br /> Exhibit A - Description of Changed Work <br /> This Change Order No. 3 modifies two existing bid items to the Contract as shown below. <br /> Modified Bid Items <br /> Bid Item#A-2—Traffic Control Labor. Modify Bid Item#A-2 entitled, "Traffic Control Labor"at <br /> the unit Contract price of$66.00/hour,by adding 110 hours to the Contract,resulting in a$7,260.00 <br /> increase to the Contract price. <br /> Bid Item#A-29—Topsoil and Seeding. Modify Bid Item#A-29 entitled, "Topsoil and Seeding" at <br /> the unit Contract price of$30.00/SY, by adding 80 square yards to the Contract,resulting in a <br /> $2,400.00 increase to the Contract price. <br /> JUSTIFICATION <br /> Bid Item#A-2—Traffic Control Labor. This bid item overran plan quantity and is being modified <br /> to account for costs for additional traffic control labor quantities. <br /> Bid Item#A-29—Topsoil and Seeding. This bid item overran plan quantity and is being modified to <br /> account for costs for additional topsoil and seeding quantities. <br /> Total Cost of Change Order No. 3: $9,660.00 <br /> Contract Time: There is no adjustment to Contract time in Change Order No.3. <br /> Page 3 of 3 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.