My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/01/30 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/01/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 9:33:00 AM
Creation date
2/14/2019 9:32:25 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/30/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Amendment No. 1 to Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with KDW Salas Consent Contact Person Jennifer Bailey <br /> O'Brien for electrical services Action Phone Number 425-257-8815 <br /> First Reading FOR AGENDA OF January 30, <br /> 2019 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head LA <br /> Administration <br /> Council Presiden <br /> Location Preceding Action Attachments Department(s)Approval <br /> Various locations—city Approved PSA 6/26/17 Amendment No. 1 Public Works <br /> sewer lift stations,water <br /> reservoir sites,WPCF, <br /> and WFP <br /> Amount Budgeted $40,519.00 <br /> Expenditure Required $60,519.00 Account Number(s): 401-5-710-109-923-410 <br /> Budget Remaining $9,729.00 <br /> Additional Required $20,000.00 <br /> DETAILED SUMMARY STATEMENT: <br /> The original Professional Services Agreement with KDW Salas O'Brien was to provide electrical <br /> engineering services and conduct an arc flash breaker coordination analysis of the city sewer lift stations <br /> and water pump stations to identify and mitigate any potential electrical safety hazards and to label hazard <br /> potential at each site, as recommended by OSHA. This amendment extends the contract term from the <br /> original end date of December 31St,2018 to December 31St,2021 to allow Salas O'Brien to complete the <br /> analysis and labels at additional locations as well as provide updates to the analysis and labels as needed <br /> for the Water Pollution Control Facility and Water Filtration Plant. There is $9,729.00 remaining on the <br /> initial contract, and this amendment provides additional funds($20,000)to complete updates as needed. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No.1 to the Professional Services Agreement with KDW Salas <br /> O'Brien to extend electrical engineering services through December 31st,2021 and add$20,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.