My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The City will forward to the Contractor all claims filed against the City that are deemed <br /> ' to have arisen in relation to the Contractor's Work or activities under this Contract, and, <br /> in the opinion of the City, are subject to the defense, indemnity, and insurance provisions <br /> of the Contract Documents. Claims will be deemed tendered to the Contractor and <br /> insurer, who has named the City as a named insured or an additional insured under the <br /> Contract's insurance provisions, once the claim has been forwarded via certified mail to <br /> the Contractor. The Contractor shall be responsible to provide a copy of the claim to the <br /> Contractor's designated insurance agent who has obtained/met the Contract's insurance <br /> I provision requirements. <br /> Within 60 calendar days following the date a claim is sent by the City to the Contractor, <br /> the Contractor shall notify the City Attorney's Office of the following: <br /> ' a. Whether the claim is allowed or is denied in whole or in part, and, if so, the <br /> specific reasons for the denial of the individual claim, and if not denied in full, <br /> when payment has been or will be made to the claimant(s) for the portion of <br /> ' the claim that is allowed, or <br /> b. If resolution negotiations are continuing. In this event, status updates will be <br /> reported no longer than every 60 calendar days until the claim is resolved or a <br /> lawsuit is filed. <br /> If the Contractor fails to provide the above notification within 60 calendar days, then the <br /> Contractor shall yield to the City sole and exclusive discretion to allow all or part of the <br /> ' claim on behalf of the Contractor, and the Contractor shall be deemed to have <br /> WAIVED any and all defenses, objections, or other avoidances to the City's <br /> allowance of the claim, or the amount allowed by the City, under common law, <br /> constitution, statute, or the Contract and these Standard Specifications. If all or <br /> part of a claim is allowed, the City will notify the Contractor via certified mail that it has <br /> allowed all or part of the claim and make appropriate payments to the claimant(s) with <br /> City funds. <br /> Payments of funds by the City to claimant(s) under this Section will be made on behalf <br /> of the Contractor and at the expense of the Contractor, and the Contractor shall be <br /> unconditionally obligated to reimburse the City for the "total reimbursement amount," <br /> ' which is the sum of the amount paid to the claimant(s), plus all costs incurred by the City <br /> in evaluating the circumstances surrounding the claim, the allowance of the claim, the <br /> amount due to the claimant, and all other direct costs for the City's administration and <br /> payment of the claim on the Contractor's behalf. The City will be authorized to withhold <br /> ' the total reimbursement amount from amounts due the Contractor, or, if no further <br /> payments are to be made to the Contractor under the Contract, the Contractor shall <br /> directly reimburse the City for the amounts paid within 30 days of the date notice that <br /> the claim was allowed was sent to the Contractor. In the event reimbursement from the <br /> Contractor is not received by the City within 30 days, interest shall accrue on the total <br /> reimbursement amount owing at the rate of 12 percent per annum calculated at a daily <br /> ' rate from the date the Contractor was notified that the claim was allowed. The City's <br /> costs to enforce recovery of these amounts are additive to the amounts owing. <br /> The Contractor specifically assumes all potential liability for actions brought by <br /> employees of the Contractor and. solely for the purpose of enforcing the defense and <br /> indemnification obligations set forth in 1-07.14, the Contractor specifically waives any <br /> immunity granted under the State industrial insurance law, Title 51 RCW. This waiver <br /> has been mutually negotiated by the parties. The Contractor shall similarly require that <br /> ' each Subcontractor it retains in connection with the project comply with the terms of this <br /> ' Cleveland Avenue Division 1 -GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-101 <br />