Laserfiche WebLink
i <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> paragraph, waive any immunity granted under Title 51 RCW, and assume all liability for <br /> actions brought by employees of the Subcontractor. <br /> The indemnity, defense and other obligations in this 1-07.14 are in addition to any <br /> indemnity, defense or other obligation that may be contained elsewhere in the Contract <br /> Documents. <br /> 1-07.17 Utilities and Similar Facilities <br /> Supplement 1-07.17 by adding the following: <br /> The Contractor shall review its responsibilities under Chapter 19.122 RCW, a law <br /> relating to underground utilities. Cost to the Contractor incurred as a result of complying <br /> with this law shall be at the Contractor's expense. In accordance with RCW 19.122. the <br /> Contractor shall call the Utility Coordinating Council One Call Center, 1-800-424- <br /> 5555, <br /> for field location, not less than 2 nor more than 10 business days before the <br /> scheduled date for commencement of excavation that may affect underground utility <br /> facilities, unless otherwise agreed upon by the parties involved. A business day is <br /> defined as any day other than Saturday, Sunday, or a legal local, State, or Federal <br /> holiday. <br /> The Contractor shall be responsible for determining the exact location, including service <br /> connections, of all public and private underground utilities marked at the site of the Work. <br /> Perform field verification prior to beginning Work that could result in damage to buried <br /> utilities, including but not limited to exploratory excavations, in sufficient time so as not <br /> to impede the progress of the Work or fabrication of materials to be incorporated into the <br /> Work. The Contractor shall immediately notify the City's Representative as to any utility <br /> discovered by him in a different position than shown on the Plans or that is not shown <br /> on the Plans. <br /> No excavation shall begin until ail known underground public and private utilities in the 111 <br /> vicinity of the excavation area have been located and marked. <br /> Utilities of record are shown on the Plans insofar as it is possible to do so. Failure of the <br /> City to show the existence of subsurface objects or installation on the Plans shall not <br /> relieve the Contractor from its responsibility to make an independent check on the <br /> ground, nor relieve Contractor from all liability for damages resulting from its operations. <br /> It shall be entirely the responsibility of the Contractor to give proper notification to the <br /> agencies that have utilities in place and to coordinate with these agencies in the <br /> protection and relocation of the various underground installations. These agencies will <br /> give assistance in the location of the various utilities, but this shall not relieve the <br /> Contractor from responsibility for any damage incurred. The City shall require a <br /> notification of at least five working days. The Contractor shall hold the City harmless <br /> against any claim of any nature resulting from Delays in attending to same. <br /> Following are addresses and telephone numbers of utilities in the Everett area for the <br /> Contractor's convenience: <br /> Snohomish County PUD #1 Puget Sound Energy <br /> P.O. Box 1107 P.O. Box 97034 BOT-01G <br /> Everett, WA 98206 Bellevue, WA 98009-9734 <br /> Attn: Erin Burke Attn: Eric Liaw <br /> Tel. (425) 783-4745 Tel. (425) 495-3297 <br /> Email: EFBurke(a�SNOPUD.com Email: eric.liaw(c�pse.com i <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-102 i <br />