Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> from showing the true amount and character of the Work performed and materials furnished <br /> by the Contractor, or from showing that any such measurement, estimate, or certificate is <br /> untrue or incorrectly made, or that the Work or materials do not conform in fact to the <br /> Contract. The City shall not be precluded or estopped, notwithstanding any such <br /> measurement, estimate, or certificate, and payment in accordance therewith,from recovering <br /> from the Contractor and the Sureties such damages as it may sustain by reason of the <br /> Contractor's failure to comply with the terms of the Contract. Neither the acceptance by the <br /> Engineer nor any payment for the whole or any part of the Work, nor any extension of time, <br /> nor any possession taken by the City shall operate as a waiver of any portion of the Contract <br /> or of any power herein reserved or any right to damages herein provided, or bar recovery of <br /> any money wrongfully or erroneously paid to the Contractor. A waiver of any breach of the <br /> Contract shall not be held to be a waiver of any other or subsequent breach. <br /> The Contractor and the City recognize that the impact of overcharges to the City by the <br /> Contractor resulting from antitrust law violations by the Contractor's suppliers or <br /> Subcontractors adversely affects the City rather than the Contractor. Therefore, the <br /> Contractor agrees to assign to the City all claims for such overcharges. <br /> 1-07.28 Community Project Liaison (CPL) <br /> Section 1-07.28 is added as follows: <br /> The Contractor will provide a full-time 'construction liaison" (Community Project Liaison, <br /> CPL) primarily responsible for addressing the needs of residents, institutions, schools, <br /> businesses etc. within and adjacent to the project area or as may otherwise be affected by <br /> the construction activities. The CPL will interface with the City of Everett, and, in particular, <br /> the inspector and construction manager. The CPL's role is intended to provide a single, <br /> responsive point of contact for the public so as to minimize the involvement of the City staff <br /> in addressing issues that can readily be resolved directly by the Contractor The CPL shall <br /> be readily accessible by telephone or in person during normal business hours and during all <br /> hours of work throughout the duration of the project. The CPL will be responsible for <br /> communicating to the City, any project information intended for the general neighborhood <br /> area, media or outside agencies. <br /> Examples of Construction Contractor and CPL responsibilities and interaction include, but ' <br /> are not limited to, the following: <br /> • CPL shall provide timely and regular communications with the City, residents, <br /> business/institution owners, and managers and any other persons affected by the <br /> construction to inform them of the status of scheduled work activities as needed. <br /> • If a complaint, question or issue should arise from the public (a resident, motorist, <br /> business owner etc.). that requires action by the Cleveland Avenue Project <br /> construction team, the CPL shall communicate that information to the Construction <br /> Manager and otherwise interface as needed between the public and the contractor to <br /> assure that the issue is resolved promptly. <br /> • CPL and the City's inspector and construction manager shall attempt to contact or <br /> otherwise meet with each individual business/institution owner or manager and <br /> affected residents to identify specific concerns in advance of construction and to <br /> promptly address specific needs during construction. <br /> • City, in coordination with the CPL. shall provide notices of impending temporary <br /> closures of streets, alleys or driveways that are otherwise used for access to parking <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-110 ' <br />