Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> lots or buildings along the area of work. The text and information contained on any <br /> ' notices shall be jointly prepared by the Construction Manager and the CPL. <br /> • Contractor, in coordination with the CPL, shall provide notices to business/institution <br /> owners and managers and/or affected residents of temporary shutdown of utilities. <br /> ' The text and information contained on any notices shall be jointly prepared by the <br /> Construction Manager and the CPL. <br /> • Contractor and CPL shall provide assistance to business/institution owners and <br /> t managers and/or affected residents to minimize and mitigate impacts during <br /> construction, including but not limited to; mail and package delivery, garbage and <br /> recycling pickup, freight delivery, handicap parking and access, customer/patient <br /> ' access and parking etc. <br /> • Contractor and CPL will coordinate to ensure needs of the community are <br /> incorporated into the contractor's construction schedule and timely updates furnished <br /> ' to the public. Contractor and CPL shall coordinate with the City during special events. <br /> • CPL shall have phone numbers with 24-hour telephone message capability for <br /> ' business/institution owners and managers and/or affected residents to request <br /> assistance or information regarding issues related to the construction project. <br /> • CPL will maintain a written log of all communications with businesses, institutions or <br /> residents that involve complaints or issues requiring response or action by the City or <br /> the construction contractor. This log will be made available for review by the Owner's <br /> Representative upon request. <br /> ' 1-08 PROSECUTION AND PROGRESS <br /> Supplement Section 1-08 by adding the following: <br /> ' 1-08.0 Preliminary Matters <br /> 1-08.0(1) Preconstruction Conference <br /> Prior to the Contractor beginning the Work, a preconstruction conference will be held <br /> ' between the Contractor, the Engineer and such other interested parties as may be <br /> invited. The purpose of the preconstruction conference will be: <br /> 1. To review the initial progress schedule; <br /> ' 2. To establish a working understanding among the various parties associated or <br /> affected by the Work; <br /> 3. To establish and review, at a minimum, procedures for progress payment, <br /> ' notifications, approvals, and submittals; <br /> 4. To establish normal working hours for the Work; <br /> 5. To review safety standards and traffic control; and <br /> ' 6. To discuss such other related items as may be pertinent to the Work. <br /> The Contractor shall prepare and submit at the preconstruction meeting the following: <br /> 1. A Schedule of Values of all lump sum items; <br /> 2. A preliminary schedule of working drawing submittals; and <br /> 3. A list of material sources for approval if applicable. <br /> 1-08.0(2) Hours of Work <br /> Except in the case of emergency or unless otherwise approved by the City, the normal <br /> straight time working hours for the Contract shall be any consecutive 8-hour period <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> ' WO No. UP3398 SP-111 <br />