My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> between 7:00 a.m. and 6:00 p.m. of a working day with a maximum 1-hour lunch break <br /> and a 5-day work week. Should Contractor elect to work on a holiday or weekend, those <br /> normal working hours shall be from 9:00 a.m. to 6:00 p.m. The normal straight time 8- <br /> hour working period for the Contract shall be established at the preconstruction <br /> conference or prior to the Contractor commencing the Work. <br /> When connecting to existing water mains and services are required, the City will obtain <br /> all necessary permissions and the normal hours of work shall be any consecutive 8-hour <br /> period between 6:00 p.m. and 7:00 a.m. Refer to 7-09.3(19)A regarding night or <br /> weekend connection work time requirements. <br /> If a Contractor is required to or desires to perform Work on holidays, weekends, or before <br /> 7:00 a.m. or after 10:00 p.m. on any weekday, the Contractor shall apply in writing to the <br /> Engineer for permission to work such times. Permission to work longer than an 8-hour <br /> period between 7:00 a.m. and 6:00 p.m. is not required. Such requests shall be <br /> submitted to the Engineer no later than noon on the working day prior to the day for <br /> which the Contractor is requesting permission to work, unless a noise variance will be <br /> required. In such case provide request a minimum of 30 days prior to performing the <br /> work in accordance with 1-07,1(1) NOISE. <br /> Permission to work Saturdays, Sundays, holidays or other than the agreed upon normal <br /> straight time working hours Monday through Friday may be given subject to certain other <br /> conditions set forth by the City or Engineer. These conditions may include, and not be <br /> limited to; requiring the Contractor to reimburse the City for the costs in excess of <br /> straight-time costs for City employees and necessary assistants who worked during such <br /> times, on non-Federal aid projects. Assistants may include, and are not be limited to, <br /> survey crews; personnel from the City's material testing lab; inspectors; and other City <br /> employees when in the opinion of the Engineer, such work necessitates their presence. <br /> The work performed on Saturdays, Sundays, and holidays will be considered as working <br /> days with regards to the Contract Time; and considering multiple work shifts as multiple <br /> working days with respect to Contract Time even though the multiple shifts occur in a <br /> single 24-hour period. <br /> 1-08.0(3) Reimbursement for Overtime Work of City Employees and <br /> Assistants <br /> Where the Contractor elects to work on a Saturday, Sunday, or holiday, or longer than <br /> an 8-hour work shift on a regular working day, as defined in the Standard Specifications, <br /> such work shall be considered as overtime work. On all such overtime work an inspector <br /> will be present, and a survey crew may be required at the discretion of the Engineer. If <br /> such work is the result of Contractor's inability to complete work or coordinate materials. <br /> equipment and labor in accordance with agreed schedule, then the City may deduct from <br /> amounts due or to become due to the Contractor for the costs in excess of the straight- <br /> time costs for employees and assistants of the City required to work overtime hours. <br /> The Contractor by these specifications does hereby authorize the Engineer to deduct <br /> such costs from the amount due or to become due to the Contractor. <br /> 1-08.1 Subcontracting <br /> Delete the eighth paragraph in 1-08.1 and substitute the following: <br /> On all projects funded with City funds only, the Contractor shall certify to the actual <br /> amounts paid Disadvantaged, Minority, or Women's Business Enterprise firms that were <br /> used as subcontractors, lower tier subcontractors, manufacturers, regular dealers, or <br /> service providers on the Contract. This certification shall be submitted to the Engineer <br /> on WSDOT form 140-542 within 20 calendar days after physical completion of the <br /> Contract. <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-112 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.