My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 4. Show Submittal preparation, submission, review, and breakdown at a <br /> minimum. Show individual parts of major Submittals. <br /> Contractor shall identify any and all Work furnished by City and installed by City on <br /> the construction schedule. <br /> 1-08.3(4) Measurement I <br /> Delete 1-08.3(4). <br /> 1-08.3(5) Payment <br /> Delete 1-08.3(5) and substitute the following: <br /> Costs incurred in performance of this Work shall be included in the contract bid <br /> items and no direct compensation shall be paid. <br /> 1-08.4 Prosecution of Work <br /> Delete 1-08.4 and substitute the following: <br /> 1-08.4 Notice to Proceed and Prosecution of Work <br /> (******) <br /> The City will issue a Notice to Proceed after the Contract has been executed and the Contract <br /> Bond and evidence of insurance have been approved and filed by the City. The Contractor <br /> shall not commence with the Work until the Notice to Proceed has been given by the City. <br /> The Contractor shall commence construction activities on the Project site within 14 calendar <br /> days of the Notice to Proceed Date, unless otherwise approved in writing. The Contractor <br /> shall diligently pursue the Work to the Physical Completion Date within the time specified in <br /> the Contract. Voluntary shutdown or slowing of operations by the Contractor shall not relieve <br /> the Contractor of the responsibility to complete the Work within the time(s) specified in the <br /> Contract. <br /> The City is not obligated to accept or pay for Work performed by the Contractor or be liable <br /> for any Delays, prior to delivery of the Notice to Proceed. The City's knowledge of Work being <br /> performed prior to delivery of the Notice to Proceed will not obligate the City to accept or pay <br /> for such Work. Contractor waives any and all Contract Claims for an adjustment of Contract <br /> Sum or Contract Time arising out of. or related to, Work it performs prior to receipt of the <br /> Notice to Proceed. <br /> The City may issue partial Notices to Proceed. Contractor may seek permission in writing to <br /> perform some Work prior to issuance to the Notice to Proceed, such as shop drawings, <br /> equipment and material Submittals, or surveying and the City or City's Representative may, <br /> in its sole discretion, approve in writing such Work prior to the issuance of the Notice to <br /> Proceed. <br /> Supplement 1-08.4 by adding the following: <br /> 1-08.4(1) Construction Progress <br /> (******) <br /> The Contractor shall furnish all labor, materials, facilities and Equipment necessary to <br /> ensure the prosecution and completion of the Project within the interim milestones, <br /> Substantial Completion, Physical Completion and Completion Dates of the Contract. If <br /> Work falls seven calendar days or more behind the reviewed Preliminary Schedule, the <br /> Contractor agrees that, at its sole cost and expense, it will take all actions necessary to <br /> return the Project to the accepted schedule. These actions may include the following: <br /> a. Increase labor in quantities and crafts. <br /> 11/ <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-118 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.