My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> any other terms related to acceptance. In such event, the City will review the City's <br /> Representative's certification that the Work is substantially complete. If the City concurs, <br /> the City will notify the Contractor in writing that the Work is accepted as substantially <br /> complete. Except for any portion(s) of Work specified for early completion or required by <br /> the City for early possession, Substantial Completion will not occur for Work until the <br /> entire Project is ready for possession and use. The acceptance Notice will include a <br /> Punch List of incomplete Work items and corrective Works, set the date for their <br /> completion and repair, describes the division of responsibility between the City and <br /> Contractor, and describe other terms of acceptance. The Contractor will acknowledge <br /> receipt of the acceptance Notice in writing, indicating acceptance of all of its terms and <br /> provisions. <br /> Subsequent to the Substantial Completion date, the City may exclude the Contractor <br /> from the Work during such periods when construction activities might interfere with the <br /> intended operation of the Project. The City, however, shall allow the Contractor <br /> reasonable access for completion or correction of incomplete Punch List items. <br /> 1-08.5(3) Acceptance of Work <br /> (******) <br /> Upon completion of the Project, including, but not limited to, record drawings, as-builts, <br /> required reports and operations and maintenance manuals, the Contractor shall so notify <br /> the City's Representative in writing. Upon receipt of the notification, the City's <br /> Representative will promptly, by personal inspection, determine the actual status of the <br /> Work in accordance with the terms of the Contract. If the City's Representative finds <br /> materials, Equipment, or workmanship that do not meet the terms of the Contract, it will <br /> prepare a Punch List of such items and submit it to the Contractor. Following completion <br /> of the corrective work by the Contractor, the City's Representative will notify the City that <br /> the Work has been completed in accordance with the Contract. The City shall make the <br /> final determination of acceptability and completion. For portions of the Project not <br /> previously accepted as substantially complete, the conditions of guarantee shall <br /> commence on the date that the City determines the Project is complete. <br /> 1-08.5(4) important Completion Deadline <br /> (******) <br /> The Contractor is advised that the City is obligated by agreement with Washington State <br /> Department of Ecology to complete construction and process payment requests for work <br /> that is eligible for grant funding no later than November 25, 2019. Completion of such <br /> work after that deadline is expected to be ineligible for grant reimbursement in <br /> which case, the City may impose Liquidated Damages. <br /> 1-08.6 Suspension of Work <br /> Supplement 1-08.6 by adding the following: <br /> 1-08.6(1) Suspension Procedures <br /> (******) <br /> The City may, at its convenience and at any time and without cause, suspend all or any <br /> part of the Work by notice in writing to the Contractor. The Contractor shall resume the <br /> Work within five (5) calendar days after receiving written notice from the City to do so. <br /> The Contractor will be allowed an increase in the Contract Sum or an extension of 111 <br /> Contract Time, or both, directly attributable to any suspension in accordance with the <br /> Change Order procedures in these Special Provisions; provided, the Contractor shall <br /> not be entitled to any increase to the extent caused by the Contractor. <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP -122 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.