My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-09.9 Payments to Contractors <br /> (******, <br /> 1-09.9(1) Progress Payments <br /> Contractor shall submit progress payment estimate for completed Work and material on <br /> hand based upon acceptable Work performed during the previous month, or since the <br /> last partial payment estimate was submitted. Submit progress payment estimate to City's <br /> Representative by the tenth day of each month, or by schedule mutually agreed upon in <br /> writing by the Contractor and City's Representative at the Pre-Construction Conference. <br /> Contractor shall make initial progress estimate not later than 30 days after the Work <br /> begins. Make successive progress estimates every month thereafter until the <br /> Completion Date. <br /> Progress estimates made during progress of the Work are tentative, and made only for <br /> the purpose of determining progress payment. The progress estimates are subject to <br /> change at any time prior to the calculation of the Final Payment. <br /> The value of the progress estimate will be the sum of the following: <br /> 1. Unit Price Items in the Proposal Form —the approximate quantity of <br /> acceptable units of work completed multiplied by the unit price. <br /> 2. Lump Sum Items in the Proposal Form —the estimated percentage complete <br /> multiplied by the Proposal Forms amount for each Lump Sum Item, or per the <br /> schedule of values for that item. <br /> 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job <br /> site or other storage area approved by the Engineer. <br /> 4. Change Orders —entitlement for approved extra cost or completed extra <br /> work as determined by the Engineer. <br /> Progress payments will be made in accordance with the progress estimate less. <br /> Ii. Retainage in accordance with 1-09.9(6) RETAINAGE, <br /> 2. The amount of Progress Payments previously made, and <br /> 3. Funds withheld by the City for disbursement in accordance with the Contract <br /> Documents. <br /> Progress payments for Work performed shall not be evidence of acceptable <br /> performance or an admission by the City that any Work has been satisfactorily <br /> completed. <br /> Payments will be made by warrants, issued by the City's fiscal officer, against the <br /> appropriate fund source for the Project. Payments received on account of Work <br /> performed by a Subcontractor are subject to the provisions of RCW 39.04.250. <br /> Contractor's submission of a progress pay estimate constitutes the Contractor's material <br /> representation that Contractor performed all of the Work described in the progress pay <br /> estimate during the relevant time period in a conformance with these Plans and <br /> Specifications and that the materials or Equipment for which payment is requested <br /> reasonably conform to the Specifications and are either on the job site or have been <br /> installed. If requested by the City's Representative, provide additional data as may be <br /> reasonably required to support the payment estimate. Additional data may include, but <br /> not be limited to, satisfactory evidence of payment for Equipment, materials and labor, <br /> including payments to Subcontractors and suppliers. Certified invoices by the suppliers <br /> shall accompany a request for payment for delivered Equipment and material. Such <br /> Equipment and material shall be suitably and safely stored at the site of the Work. <br /> Cleveland Avenue Division 1 -GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.