Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The hours eligible for"Traffic Control Labor" shall be for the hours actually worked, plus <br /> 1 hour of on-site orientation per flagger. "Show-up time" will not be counted. The labor <br /> to perform the Work described in the item "Maintenance and Protection of Traffic Control" <br /> is specifically excluded from this Work. No adjustment will be made to the unit price for <br /> "Traffic Control Labor"for overtime or holiday hours worked. <br /> 1-10.3(4)A Traffic Control — Off-Duty Police Officer <br /> Provide off-duty uniformed Police Officer for traffic control at all signalized <br /> intersections. Acceptable sources for off-duty uniformed Police Officers are as <br /> follows in order of preference: <br /> 1. City of Everett Police Department, contact either, <br /> a. Officer Mike Bernardi, (425) 327-9119 ' <br /> b. Officer Mike Drake, (425) 244-0025 <br /> 2. Puget Sound Executive Service, 625 B 5th Ave, Ste 4, Sequim, WA <br /> 98382 <br /> a. Contact Nick Janssen, (360) 681-7737 <br /> 1-10.3(5) Construction Signs <br /> All signs required by the approved traffic control plan(s) as well as any other appropriate <br /> signs prescribed by the Engineer will be furnished by the Contractor and be paid under <br /> the item "Maintenance and Protection of Traffic Control."The Contractor shall erect them <br /> on posts or supports and maintain them in a clean, neat, and presentable condition until <br /> the necessity for them has ceased.All non-applicable signs shall be removed or covered <br /> with either metal or plywood during periodsneded. When the needods when they are not e <br /> for any of these signs has ceased, the Contractor, upon approval of the Engineer, shall <br /> take down these signs, posts, or supports. All signs, posts, and supports shall be <br /> removed from the project and shall remain the property of the Contractor. <br /> There shall be no separate classification of signs. Ali construction signs, whether used <br /> throughout the construction, during a major phase of construction or removed daily shall111 <br /> be paid under the item "Maintenance and Protection of Traffic Control." Portable or <br /> temporary mountings may require added weight for stability. If it is necessary to add <br /> weight to the signs, only a bag of sand that will rupture on impact shall be used. The bag <br /> of sand shall have a maximum weight of 40 pounds and shall be suspended no more <br /> than 1-foot from the ground. <br /> The Work to provide the construction signing shall be: <br /> 1 . Furnishing all construction signs. <br /> 2. Furnishing, removing, and disposing of the posts or supports for the signs. <br /> 3. Initial installation and subsequent removal of all construction signs. <br /> 4. Furnishing labor and materials for maintaining the signs in a clean and <br /> presentable condition; <br /> 5 All other incidentals necessary for providing the construction signs according <br /> to the approved traffic control plan(s). <br /> Signs, posts, or supports that are lost, stolen, destroyed, or which the Engineer deems <br /> to be unacceptable, while their use is required on the project, shall be replaced by the <br /> Contractor without additional compensation. <br /> 1-10.4 Measurement <br /> Delete 1-10.4 and substitute the following: I <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-150 1 <br />