My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> • <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT <br /> 2-03.1 Description <br /> Supplement 2-03.1 by adding the following: <br /> This Work applies to street pavement patching and street reconstruction after completion <br /> ' of utility work. Grading for street reconstruction shall conform to COE Standard Drawing <br /> No. 302, unless otherwise noted on the Plans. Grading for pavement patching shall <br /> conform to COE Standard Drawing No. 326, unless otherwise noted on the Plans. <br /> 1 <br /> 2-03.2 Vacant <br /> Revise 2-03.2 as follows: <br /> 2.03.2 Materials <br /> Materials shall meet the requirements of the following: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> ' Gravel Borrow 9-03.14(1) Standard Specifications <br /> 2-03.3 Construction Requirements <br /> Supplement 2-03.3 by adding the following: <br /> ' Blasting is not allowed within the City limits of Everett. <br /> Use suitable excavated material for roadway embankments. Dispose of surplus <br /> excavated material or unsuitable material in accordance with 2-03.3(7). <br /> Engineer will not approve payment for unauthorized excavation or embankment, or both, <br /> beyond the limits indicated on the Plans. Return areas of unauthorized excavation or <br /> embankment, or both, to their original conditions or better at the Contractor's expense. <br /> Fine grading in fill or backfill areas shall begin within the top six inches of subgrade. Final <br /> grading shall produce a uniform surface within established tolerances and without abrupt <br /> changes in grade. <br /> Construction requirements for pavement patching authorized by Engineer outside of <br /> Project limits shall be in accordance with the Section 5-04 and City Standard Drawing <br /> No. 326 for existing asphalt concrete over prepared grade. <br /> ' Provide temporary drainage to keep the subgrade free from standing water. <br /> Ensure the top six inches of subgrade is free from rocks or cemented lumps larger than <br /> 2-1/2 inches in greatest dimension. <br /> ' Excavate for curbs and gutters by accurately cutting to the cross-sections, grades, and <br /> elevations shown. Take care not to excavate below the specified grades. Maintain all <br /> excavations free from accumulation of detrimental quantities of leaves, brush, sticks, <br /> ' trash, and other debris. <br /> 2-03.3(2) Rock Cuts <br /> Delete entire section. <br /> 1 <br /> 2-03.3(3) Excavation Below Subgrade <br /> Supplement 2-03.3(3) by adding the following: <br /> Proof Rolling: Proof roll subgrade under the roadway with a fully loaded tandem <br /> truck following trench backfilling and grading to subgrade to identify soft or loose <br /> areas in the subgrade. In areas where the subgrade does not stand up to the proof <br /> roll, over excavate the subgrade and replace with imported Foundation Material <br /> Class A or B or Gravel Borrow, as determined by the Engineer, to bring the subgrade <br /> up to the proper compaction and grade. Compact backfill material in accordance <br /> with 2-03.3(3). <br /> Cleveland Avenue Division 2-EARTHWORK November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> Work Order No. UP3398 SP-157 <br />
The URL can be used to link to this page
Your browser does not support the video tag.